Browse wiki

Jump to navigation Jump to search
At approximately 0125 (hrs. CDT), the AquaAt approximately 0125 (hrs. CDT), the AquaDam providing enhanced flood protection for FCS (Ft. Calhoun Station) Unit 1 failed. At 0221, as a precautionary measure, DG-2 (Diesel Generator) was automatically started per plant procedure to divorce bus 1A4 from offsite power. At 0250, DG-1 was automatically started to divorce bus 1A3. Both Emergency Diesel Generators loaded on buses as designed. 345KV and 161KV offsite power remain available. </br>This is reportable pursuant to 10CFR50.72(b)(3)(iv)(A), 'System Actuation of the Emergency Diesel Generators'. All safety related flood protection barriers remain in place.</br>Current river level is 1006.5' MSL and stable. FCS remains in a NOUE (Notification of Unusual Event) due to high river level. </br>NRC personnel stationed onsite for flood monitoring have been informed.e for flood monitoring have been informed.  +
05:00:00, 26 June 2011  +
07:58:00, 26 June 2011  +
05:00:00, 26 June 2011  +
At approximately 0125 (hrs. CDT), the AquaAt approximately 0125 (hrs. CDT), the AquaDam providing enhanced flood protection for FCS (Ft. Calhoun Station) Unit 1 failed. At 0221, as a precautionary measure, DG-2 (Diesel Generator) was automatically started per plant procedure to divorce bus 1A4 from offsite power. At 0250, DG-1 was automatically started to divorce bus 1A3. Both Emergency Diesel Generators loaded on buses as designed. 345KV and 161KV offsite power remain available. </br>This is reportable pursuant to 10CFR50.72(b)(3)(iv)(A), 'System Actuation of the Emergency Diesel Generators'. All safety related flood protection barriers remain in place.</br>Current river level is 1006.5' MSL and stable. FCS remains in a NOUE (Notification of Unusual Event) due to high river level. </br>NRC personnel stationed onsite for flood monitoring have been informed.e for flood monitoring have been informed.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 26 June 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:27:41, 24 September 2017  +
07:58:00, 26 June 2011  +
false  +
0.124 d (2.97 hours, 0.0177 weeks, 0.00407 months)  +
05:00:00, 26 June 2011  +
Both Emergency Diesel Generators Supplying Plant Emergency Buses Per Plant Procedure  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +