At 1315 hours on Tuesday, May 10, 2011, wiAt 1315 hours on Tuesday, May 10, 2011, with the Reactor Mode Select Switch in Startup, the Reactor Protection System (RPS) actuated due to a valid Hi-Hi trip signal from the Intermediate Range Monitors (IRMs) of the Neutron Monitoring System. At the time of the RPS actuation, reactor thermal power was four (4)% and control rods were being withdrawn as part of a planned reactor startup from a refueling outage. The RPS actuation signal resulted in a reactor scram. The IRMs were in range 7 when the scram occurred.</br>All control rods automatically inserted in accordance with design. No other ESF actuation signals were generated. The reactor scram was not part of pre-planned test or reactor operation. The cause of the Hi-Hi IRM trip signal is under investigation.</br>This event had no impact on the health and/or safety of the public.</br>The licensee has notified the NRC Senior Resident Inspector.</br>This 4-hour notification is being made in accordance with 10CFR50.72(b)(2)(iv)(B).</br>The unit is in a normal post trip electrical alignment. Decay heat is being removed via the main steam line drains to the main condenser.</br>The licensee will notify the Massachusetts Emergency Management Agency.Massachusetts Emergency Management Agency.  +
17:15:00, 10 May 2011  +
16:15:00, 10 May 2011  +
17:15:00, 10 May 2011  +
At 1315 hours on Tuesday, May 10, 2011, wiAt 1315 hours on Tuesday, May 10, 2011, with the Reactor Mode Select Switch in Startup, the Reactor Protection System (RPS) actuated due to a valid Hi-Hi trip signal from the Intermediate Range Monitors (IRMs) of the Neutron Monitoring System. At the time of the RPS actuation, reactor thermal power was four (4)% and control rods were being withdrawn as part of a planned reactor startup from a refueling outage. The RPS actuation signal resulted in a reactor scram. The IRMs were in range 7 when the scram occurred.</br>All control rods automatically inserted in accordance with design. No other ESF actuation signals were generated. The reactor scram was not part of pre-planned test or reactor operation. The cause of the Hi-Hi IRM trip signal is under investigation.</br>This event had no impact on the health and/or safety of the public.</br>The licensee has notified the NRC Senior Resident Inspector.</br>This 4-hour notification is being made in accordance with 10CFR50.72(b)(2)(iv)(B).</br>The unit is in a normal post trip electrical alignment. Decay heat is being removed via the main steam line drains to the main condenser.</br>The licensee will notify the Massachusetts Emergency Management Agency.Massachusetts Emergency Management Agency.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0152 d (0.365 hours, 0.00217 weeks, 5.003575e-4 months)  +
00:00:00, 10 May 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:28:03, 24 September 2017  +
16:15:00, 10 May 2011  +
-0.0417 d (-1 hours, -0.00595 weeks, -0.00137 months)  +
17:15:00, 10 May 2011  +
Reactor Protection System Actuation During Start-Up  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +