At 12:43 on Monday, March 15, 2010, the 10 … At 12:43 on Monday, March 15, 2010, the 103 Emergency Diesel Generator (EDG) was inadvertently started during standby circuit checks. The standby circuit checks test was a planned evolution that was not intended to cause a start of the EDG. Following the start of the EDG, the standby circuit check test was stopped and the running checks for the diesel were completed satisfactory at 12:50. The EDG was secured at 13:03, after functioning successfully.</br>The EDG was not started by a valid initiation signal. A valid initiation signal is degraded or loss of voltage to the Power Board (PB) 103. Also, the EDG output breaker did not close since the PB 103 was not deenergized.</br>This event is not considered an LER. This report is being made under 10 CFR 50.73(a)(2)(iv)(A) (requires reporting within 60 days when a event or condition that resulted in manual or automatic actuation of the EDG AC Electrical Power Systems, including EDG System occurs.)</br>EDG 103 is the train that actuated. EDG 103 actuation was not complete since breaker did not close. EDG 103 started and remained operable throughout the event; output breaker would have closed and supplied PB 103 if required.</br>The event has been entered into the corrective action program.</br>There are no other adverse impacts to the station based on this event.mpacts to the station based on this event. +
16:43:00, 15 March 2010 +
45,779 +
14:07:00, 19 March 2010 +
16:43:00, 15 March 2010 +
At 12:43 on Monday, March 15, 2010, the 10 … At 12:43 on Monday, March 15, 2010, the 103 Emergency Diesel Generator (EDG) was inadvertently started during standby circuit checks. The standby circuit checks test was a planned evolution that was not intended to cause a start of the EDG. Following the start of the EDG, the standby circuit check test was stopped and the running checks for the diesel were completed satisfactory at 12:50. The EDG was secured at 13:03, after functioning successfully.</br>The EDG was not started by a valid initiation signal. A valid initiation signal is degraded or loss of voltage to the Power Board (PB) 103. Also, the EDG output breaker did not close since the PB 103 was not deenergized.</br>This event is not considered an LER. This report is being made under 10 CFR 50.73(a)(2)(iv)(A) (requires reporting within 60 days when a event or condition that resulted in manual or automatic actuation of the EDG AC Electrical Power Systems, including EDG System occurs.)</br>EDG 103 is the train that actuated. EDG 103 actuation was not complete since breaker did not close. EDG 103 started and remained operable throughout the event; output breaker would have closed and supplied PB 103 if required.</br>The event has been entered into the corrective action program.</br>There are no other adverse impacts to the station based on this event.mpacts to the station based on this event. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 19 March 2010 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:10:05, 2 March 2018 +
14:07:00, 19 March 2010 +
true +
false +
3.892 d (93.4 hours, 0.556 weeks, 0.128 months) +