At 2045 EST on December 15, 2023, it was dAt 2045 EST on December 15, 2023, it was determined that the reactor coolant system barrier had a through wall flaw with leakage. The leakage is minor in nature and unquantifiable. The leakage is coming from the welded connection of a vent valve for safety injection tank 2A2 outlet valve rendering both trains of high-pressure safety injection inoperable. The unit is being cooled down to cold shutdown to comply with technical specifications.</br>This event is being reported pursuant to 10 CFR 50.72(b)(3)(ii)(A) and 10 CFR 50.72(b)(3)(v)(D).</br>The NRC Resident Inspector has been notified.</br>The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:</br>The unit was heating up after a maintenance outage. The leak was discovered during mode 3 walkdown.</br>* * *UPDATE AT 1254 EST ON 02/12/24 FROM B. MURRELL TO T. HERRITY***</br>The purpose of this notification update is to retract a portion of a previous report, made on 12/16/2023 at 0404 EST (EN 56893). Notification of the event to the NRC was initially made as a result of declaring both trains of unit 2 high pressure safety injection system inoperable due to reactor coolant barrier through wall leak on the vent line for the 2A2 safety injection tank.</br>Subsequent to the initial report, Florida Power and Light has concluded that the through wall leak rate was insignificant, and therefore the safety injection system's safety-related function was maintained. </br>Therefore, this portion of the event is not considered a safety system functional failure and is not reportable to the NRC pursuant 10 CFR 50.72(3)(v)(D). </br>This update does not affect the original 10 CFR 50.72(b)(3)(ii)(A) report for the degraded condition related to the reactor coolant barrier through wall leak. </br>The NRC Resident Inspector has been notified.</br>Notified R2DO (Miller).has been notified. Notified R2DO (Miller).  +
01:45:00, 16 December 2023  +
56,893  +
04:04:00, 16 December 2023  +
01:45:00, 16 December 2023  +
At 2045 EST on December 15, 2023, it was dAt 2045 EST on December 15, 2023, it was determined that the reactor coolant system barrier had a through wall flaw with leakage. The leakage is minor in nature and unquantifiable. The leakage is coming from the welded connection of a vent valve for safety injection tank 2A2 outlet valve rendering both trains of high-pressure safety injection inoperable. The unit is being cooled down to cold shutdown to comply with technical specifications.</br>This event is being reported pursuant to 10 CFR 50.72(b)(3)(ii)(A) and 10 CFR 50.72(b)(3)(v)(D).</br>The NRC Resident Inspector has been notified.</br>The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:</br>The unit was heating up after a maintenance outage. The leak was discovered during mode 3 walkdown.</br>* * *UPDATE AT 1254 EST ON 02/12/24 FROM B. MURRELL TO T. HERRITY***</br>The purpose of this notification update is to retract a portion of a previous report, made on 12/16/2023 at 0404 EST (EN 56893). Notification of the event to the NRC was initially made as a result of declaring both trains of unit 2 high pressure safety injection system inoperable due to reactor coolant barrier through wall leak on the vent line for the 2A2 safety injection tank.</br>Subsequent to the initial report, Florida Power and Light has concluded that the through wall leak rate was insignificant, and therefore the safety injection system's safety-related function was maintained. </br>Therefore, this portion of the event is not considered a safety system functional failure and is not reportable to the NRC pursuant 10 CFR 50.72(3)(v)(D). </br>This update does not affect the original 10 CFR 50.72(b)(3)(ii)(A) report for the degraded condition related to the reactor coolant barrier through wall leak. </br>The NRC Resident Inspector has been notified.</br>Notified R2DO (Miller).has been notified. Notified R2DO (Miller).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 12 February 2024  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:30:05, 13 February 2024  +
04:04:00, 16 December 2023  +
false  +
false  +
0.0967 d (2.32 hours, 0.0138 weeks, 0.00318 months)  +
01:45:00, 16 December 2023  +
Reactor Coolant System Leak  +