The following information was provided by The following information was provided by the licensee via email:</br>At 1545 CST on November 10, 2023, personnel at Waterford Steam Electric Station Unit 3 determined that 19 conduits in the engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition meets the criteria involving an unanalyzed condition that significantly affects plant safety.</br>The plant is currently defueled. Decay heat is being removed by normal spent fuel cooling system operations. ESFAS is not required to be operable in the current plant mode.</br>This event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(ii)(B) as an unanalyzed condition that significantly degrades plant safety.</br>There was no impact to the health and safety of the public or plant personnel.</br>The NRC Region 4 Branch Chief (Dixon) has been notified.</br>* * * RETRACTION ON 1/8/2024 AT 1222 EST FROM PETER RAMON TO ERNEST WEST * * *</br>On November 10, 2023, Waterford Steam Electric Station Unit 3 reported in EN 56849 that 19 conduits in engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition met the criteria involving an unanalyzed condition that significantly affects plant safety.</br>Waterford 3 has determined that the ESFAS auxiliary relay cabinets A and B jumper conduits do not require fire seals based on review of an engineering specification that specifies the size and length of conduits which require fire seals to be installed. None of the nineteen affected conduits meet the size and length criteria that would necessitate installation of a fire seal. Based on this, the condition described in EN 56849 is not considered to be an unanalyzed condition that significantly affects plant safety as described in 10 CFR 50.72(b)(3)(ii)(B) and therefore is not reportable.</br>The licensee notified the NRC Resident Inspector.</br>Notified R4DO (Gaddy) Resident Inspector. Notified R4DO (Gaddy)  
21:45:00, 10 November 2023  +
56,849  +
00:23:00, 11 November 2023  +
21:45:00, 10 November 2023  +
The following information was provided by The following information was provided by the licensee via email:</br>At 1545 CST on November 10, 2023, personnel at Waterford Steam Electric Station Unit 3 determined that 19 conduits in the engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition meets the criteria involving an unanalyzed condition that significantly affects plant safety.</br>The plant is currently defueled. Decay heat is being removed by normal spent fuel cooling system operations. ESFAS is not required to be operable in the current plant mode.</br>This event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(ii)(B) as an unanalyzed condition that significantly degrades plant safety.</br>There was no impact to the health and safety of the public or plant personnel.</br>The NRC Region 4 Branch Chief (Dixon) has been notified.</br>* * * RETRACTION ON 1/8/2024 AT 1222 EST FROM PETER RAMON TO ERNEST WEST * * *</br>On November 10, 2023, Waterford Steam Electric Station Unit 3 reported in EN 56849 that 19 conduits in engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition met the criteria involving an unanalyzed condition that significantly affects plant safety.</br>Waterford 3 has determined that the ESFAS auxiliary relay cabinets A and B jumper conduits do not require fire seals based on review of an engineering specification that specifies the size and length of conduits which require fire seals to be installed. None of the nineteen affected conduits meet the size and length criteria that would necessitate installation of a fire seal. Based on this, the condition described in EN 56849 is not considered to be an unanalyzed condition that significantly affects plant safety as described in 10 CFR 50.72(b)(3)(ii)(B) and therefore is not reportable.</br>The licensee notified the NRC Resident Inspector.</br>Notified R4DO (Gaddy) Resident Inspector. Notified R4DO (Gaddy)  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 January 2024  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
12:30:09, 9 January 2024  +
00:23:00, 11 November 2023  +
false  +
false  +
0.11 d (2.63 hours, 0.0157 weeks, 0.0036 months)  +
true  +
21:45:00, 10 November 2023  +
Unanalyzed Condition  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
3  +