Browse wiki

Jump to navigation Jump to search
Pursuant to 10 CFR 21.21 (d)(3)(i), ParagoPursuant to 10 CFR 21.21 (d)(3)(i), Paragon Energy Solutions is providing initial notification of the identification of a deviation.</br>Condition that requires evaluation:</br>NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by Nuclear Logistics under PO: NU-02SR726683 in 2010.</br>The original seismic qualification was questioned by plant personnel related to the size of the bolting utilized for the diagonal cross braces on the two lower chiller frames. Paragon performed a review and additional analysis of the original qualification report. It was confirmed that the bolting which was utilized to install the pinned diagonal braces on the condenser and compressor frame sections does not have a sufficient load bearing capacity to support the application loading during a seismic event.</br>The upset and emergency loading for the diagonal brace is 5.59 kip and 8.59 kip, respectively. Compared to the load capacity of 2.32 kip and 3.09 kip for upset and emergency, respectively, for the 3/8" bolt in single-shear configuration with threads included in the shear plane.</br>This condition does not affect normal operation of the chiller. However, this deviation has the potential to impact the ability to maintain structural integrity during a seismic event.</br>Date of Discovery: 6/8/2021</br>Formal notification will be submitted on or before 7/8/2021.</br>Paragon contact: Tracy Bolt, Chief Nuclear Officer, Paragon Energy Solutions, 817-284-0077, tbolt@paragones.com.</br>This equipment was supplied to V.C. Summer Nuclear Station.</br>* * * UPDATE FROM TRACY BOLT TO DONALD NORWOOD ON 6/28/2021 AT 1459 EDT * * *</br>The following information was recevied via E-mail: </br>Pursuant to 10 CFR 21.21(b), Paragon Energy Solutions, LLC is providing written notification of the identification of a deviation. On 6/24/2021, Paragon has determined that we do not have the capability to perform the evaluation to determine if the deviation, if left uncorrected, could create a substantial safety hazard. VC Summer has been notified within five working days of this determination so that they can evaluate the deviation or failure to comply, pursuant to 10 CFR 21.21(a).</br>Condition that requires evaluation: NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by NLI to VC Summer station under PO: NU-02SR726683 in 2010. Ref. P21-06102021-IN, Rev. 0 (ML21174A009)</br>Name and address of the individual or individuals informing the Commission: Tracy Bolt, Chief Nuclear Officer. Paragon Energy Solutions, LLC, 7410 Pebble Drive, Ft. Worth, TX 76118.</br>Notified R2DO (Miller), R4DO (Werner), and the Part 21/50.55 Reactors E-mail group.d the Part 21/50.55 Reactors E-mail group.  
05:00:00, 8 June 2021  +
55,300  +
15:56:00, 10 June 2021  +
05:00:00, 8 June 2021  +
Pursuant to 10 CFR 21.21 (d)(3)(i), ParagoPursuant to 10 CFR 21.21 (d)(3)(i), Paragon Energy Solutions is providing initial notification of the identification of a deviation.</br>Condition that requires evaluation:</br>NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by Nuclear Logistics under PO: NU-02SR726683 in 2010.</br>The original seismic qualification was questioned by plant personnel related to the size of the bolting utilized for the diagonal cross braces on the two lower chiller frames. Paragon performed a review and additional analysis of the original qualification report. It was confirmed that the bolting which was utilized to install the pinned diagonal braces on the condenser and compressor frame sections does not have a sufficient load bearing capacity to support the application loading during a seismic event.</br>The upset and emergency loading for the diagonal brace is 5.59 kip and 8.59 kip, respectively. Compared to the load capacity of 2.32 kip and 3.09 kip for upset and emergency, respectively, for the 3/8" bolt in single-shear configuration with threads included in the shear plane.</br>This condition does not affect normal operation of the chiller. However, this deviation has the potential to impact the ability to maintain structural integrity during a seismic event.</br>Date of Discovery: 6/8/2021</br>Formal notification will be submitted on or before 7/8/2021.</br>Paragon contact: Tracy Bolt, Chief Nuclear Officer, Paragon Energy Solutions, 817-284-0077, tbolt@paragones.com.</br>This equipment was supplied to V.C. Summer Nuclear Station.</br>* * * UPDATE FROM TRACY BOLT TO DONALD NORWOOD ON 6/28/2021 AT 1459 EDT * * *</br>The following information was recevied via E-mail: </br>Pursuant to 10 CFR 21.21(b), Paragon Energy Solutions, LLC is providing written notification of the identification of a deviation. On 6/24/2021, Paragon has determined that we do not have the capability to perform the evaluation to determine if the deviation, if left uncorrected, could create a substantial safety hazard. VC Summer has been notified within five working days of this determination so that they can evaluate the deviation or failure to comply, pursuant to 10 CFR 21.21(a).</br>Condition that requires evaluation: NLI 280-ton Custom Chillers, Serial Numbers XHX-0001A / XHX-0001B / XHX-0001C. The Chillers were originally supplied by NLI to VC Summer station under PO: NU-02SR726683 in 2010. Ref. P21-06102021-IN, Rev. 0 (ML21174A009)</br>Name and address of the individual or individuals informing the Commission: Tracy Bolt, Chief Nuclear Officer. Paragon Energy Solutions, LLC, 7410 Pebble Drive, Ft. Worth, TX 76118.</br>Notified R2DO (Miller), R4DO (Werner), and the Part 21/50.55 Reactors E-mail group.d the Part 21/50.55 Reactors E-mail group.  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 28 June 2021  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
11:30:04, 29 June 2021  +
15:56:00, 10 June 2021  +
2.455 d (58.93 hours, 0.351 weeks, 0.0807 months)  +
05:00:00, 8 June 2021  +
Part 21 Initial Report - Deviation Identified in Bolting Utilized to Maintain Seismic Qualification:  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.