Browse wiki

Jump to navigation Jump to search
The following is a synopsis of the informaThe following is a synopsis of the information received from the supplier. </br>On August 26, 2020, H. B. Robinson Generating Station, Unit 2 experienced a failure during post maintenance testing of a newly installed air conditioning compressor, which serves one of the Control Room HVAC units. Robinson plant contacted QualTech (the supplier) on September 22, 2020, detailing the findings of their investigation which indicated an incorrect head gasket had been installed, allowing high pressure gas to discharge to the low pressure side. </br>QualTech NP reviewed the investigation and agrees, the incorrect gasket was installed. The root cause was determined to be an improper dedication plan of the gaskets, not recognizing the delta between the 'left' and 'right' head gaskets. QualTech has taken action to revise the dedication plan. This is the only compressor unit of this model sold. No other similar failures have been reported. QualTech believes this to be an isolated case.</br>For further information contact: </br>Tim Franchuk</br>Quality Assurance Director </br>QualTech NP, Curtiss-Wright Nuclear Division </br>(513) 528-7900 x176ight Nuclear Division (513) 528-7900 x176  +
04:00:00, 26 August 2020  +
54,998  +
09:32:00, 16 November 2020  +
04:00:00, 26 August 2020  +
The following is a synopsis of the informaThe following is a synopsis of the information received from the supplier. </br>On August 26, 2020, H. B. Robinson Generating Station, Unit 2 experienced a failure during post maintenance testing of a newly installed air conditioning compressor, which serves one of the Control Room HVAC units. Robinson plant contacted QualTech (the supplier) on September 22, 2020, detailing the findings of their investigation which indicated an incorrect head gasket had been installed, allowing high pressure gas to discharge to the low pressure side. </br>QualTech NP reviewed the investigation and agrees, the incorrect gasket was installed. The root cause was determined to be an improper dedication plan of the gaskets, not recognizing the delta between the 'left' and 'right' head gaskets. QualTech has taken action to revise the dedication plan. This is the only compressor unit of this model sold. No other similar failures have been reported. QualTech believes this to be an isolated case.</br>For further information contact: </br>Tim Franchuk</br>Quality Assurance Director </br>QualTech NP, Curtiss-Wright Nuclear Division </br>(513) 528-7900 x176ight Nuclear Division (513) 528-7900 x176  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 16 November 2020  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
16:11:48, 15 January 2021  +
09:32:00, 16 November 2020  +
82.189 d (1,972.53 hours, 11.741 weeks, 2.702 months)  +
04:00:00, 26 August 2020  +
Part 21 Report - Failure of Air Conditioner Compressor Head Gasket  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.