On September 4, 2020, DC Cook Unit 2 exper … On September 4, 2020, DC Cook Unit 2 experienced a lowering Reactor Coolant System (RCS) pressure caused by a failed open Reactor Coolant Pressurizer Spray valve. At approximately 2242 (EDT), a manual Reactor Trip was performed due to the lowering RCS pressure. Following the manual reactor trip, an automatic Safety Injection was actuated due to the lowering RCS pressure. RCS pressure has recovered to normal and is stable.</br>This notification is being made in accordance with 10 CFR 50.72(b)(2)(iv)(B), Reactor Protection System (RPS) actuation, and 10 CFR 50.72(b)(2)(iv)(A), ECCS Discharge to RCS, as a four (4) hour report. Notification is also being made as an 8 hour report under 10 CFR 50.72(b)(3)(iv)(A), Reactor Protection System (RPS), Containment Isolation, Emergency Core Cooling (ECCS), Auxiliary Feedwater System (AFW), and Emergency AC Electrical Power actuations. The DC Cook Resident NRC Inspector has been notified.</br>Unit 2 is being supplied by offsite power. All control rods fully inserted. Aux Feedwater Pumps started as required and are operating properly. All ECCS components operated as required including Containment Isolation. Decay heat is being removed via the Condenser Steam Dumps and ECCS has been secured. Three of four Reactor Coolant Pumps were secured and RCS pressure has recovered to normal pressure and is stable. Preliminary evaluation indicates all plant systems functioned normally following the Reactor Trip and Safety Injection. DC Cook Unit 2 remains stable in Mode 3. No radioactive release is in progress as a result of this event.</br>Unit 1 was not affected and remains in Mode 1, 100 % power.fected and remains in Mode 1, 100 % power. +
02:42:00, 5 September 2020 +
54,885 +
02:27:00, 5 September 2020 +
02:42:00, 5 September 2020 +
On September 4, 2020, DC Cook Unit 2 exper … On September 4, 2020, DC Cook Unit 2 experienced a lowering Reactor Coolant System (RCS) pressure caused by a failed open Reactor Coolant Pressurizer Spray valve. At approximately 2242 (EDT), a manual Reactor Trip was performed due to the lowering RCS pressure. Following the manual reactor trip, an automatic Safety Injection was actuated due to the lowering RCS pressure. RCS pressure has recovered to normal and is stable.</br>This notification is being made in accordance with 10 CFR 50.72(b)(2)(iv)(B), Reactor Protection System (RPS) actuation, and 10 CFR 50.72(b)(2)(iv)(A), ECCS Discharge to RCS, as a four (4) hour report. Notification is also being made as an 8 hour report under 10 CFR 50.72(b)(3)(iv)(A), Reactor Protection System (RPS), Containment Isolation, Emergency Core Cooling (ECCS), Auxiliary Feedwater System (AFW), and Emergency AC Electrical Power actuations. The DC Cook Resident NRC Inspector has been notified.</br>Unit 2 is being supplied by offsite power. All control rods fully inserted. Aux Feedwater Pumps started as required and are operating properly. All ECCS components operated as required including Containment Isolation. Decay heat is being removed via the Condenser Steam Dumps and ECCS has been secured. Three of four Reactor Coolant Pumps were secured and RCS pressure has recovered to normal pressure and is stable. Preliminary evaluation indicates all plant systems functioned normally following the Reactor Trip and Safety Injection. DC Cook Unit 2 remains stable in Mode 3. No radioactive release is in progress as a result of this event.</br>Unit 1 was not affected and remains in Mode 1, 100 % power.fected and remains in Mode 1, 100 % power. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 5 September 2020 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
16:23:00, 15 January 2021 +
02:27:00, 5 September 2020 +
-0.0104 d (-0.25 hours, -0.00149 weeks, -3.4245e-4 months) +
02:42:00, 5 September 2020 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.