At 2021 (CDT) on 05/01/2016 Unit 1 automatAt 2021 (CDT) on 05/01/2016 Unit 1 automatically tripped due to a generator lockout. Relay 86/G1 actuated. The generator lockout resulted in a Unit 1 turbine trip and a reactor trip.</br>Auxiliary Feedwater and Feedwater Isolation actuated as designed.</br>All Control Rods fully inserted.</br>No primary or secondary relief valves opened.</br>There were no electrical problems.</br>Normal operating temperature and pressure is (being maintained).</br>There were no significant TS LCO's entered.</br>This event was not significant to the health and safety of the public based on all safety systems performed as designed.</br>Unit 2 was not affected.</br>Unit 1 is stable in Mode 3, with decay heat being removed via dump valves to the condenser. The cause of the generator lockout is under investigation.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
01:21:00, 2 May 2016  +
51,897  +
22:14:00, 1 May 2016  +
01:21:00, 2 May 2016  +
At 2021 (CDT) on 05/01/2016 Unit 1 automatAt 2021 (CDT) on 05/01/2016 Unit 1 automatically tripped due to a generator lockout. Relay 86/G1 actuated. The generator lockout resulted in a Unit 1 turbine trip and a reactor trip.</br>Auxiliary Feedwater and Feedwater Isolation actuated as designed.</br>All Control Rods fully inserted.</br>No primary or secondary relief valves opened.</br>There were no electrical problems.</br>Normal operating temperature and pressure is (being maintained).</br>There were no significant TS LCO's entered.</br>This event was not significant to the health and safety of the public based on all safety systems performed as designed.</br>Unit 2 was not affected.</br>Unit 1 is stable in Mode 3, with decay heat being removed via dump valves to the condenser. The cause of the generator lockout is under investigation.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 1 May 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:45:15, 2 March 2018  +
22:14:00, 1 May 2016  +
-0.13 d (-3.12 hours, -0.0186 weeks, -0.00427 months)  +
01:21:00, 2 May 2016  +
Automatic Reactor Trip Due to Generator Lockout  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +