At 0445 (CDT) on July 10, 2014, Browns FerAt 0445 (CDT) on July 10, 2014, Browns Ferry Unit 2 initiated actions to commence a reactor shutdown to comply with TS LCO 3.0.3. TS LCO 3.0.3 was entered at 0355 (CDT) and was required due to the 'C' Emergency Diesel Generator becoming inoperable after isolating a leak on the Emergency Equipment Cooling Water System. Currently, a 7 day TS LCO Action 3.5.1.A is in effect due to ongoing scheduled Core Spray Loop I maintenance outage. The declaration of inoperability of the equipment supported by the 'C' Emergency Diesel Generator, Core Spray Loop II, along with the redundant Core Spray system inoperable for maintenance resulted in TS LCO 3.0.3 for Unit 2. TS LCO 3.0.3 requires actions to be initiated within one hour; to place the unit in MODE 2 within 10 hours; MODE 3 within 13 hours; and MODE 4 within 37 hours.</br>This event requires a 4 hour report lAW 50.72(b)(2)(i), 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.'</br>Actions were taken to restore the Core Spray System to Operable status and LCO 3.0.3 was exited at 0735 (CDT) on July 10, 2014.</br>The NRC Resident Inspector has been notified.</br>This event was entered into the Corrective Action Program.</br>Browns Ferry Unit 2 had reduced power to 98% when LCO 3.0.3 was exited, the power reduction was suspended, and preparations are being made to return power to 100%. There is no impact on Units 1 or 3.100%. There is no impact on Units 1 or 3.  +
09:45:00, 10 July 2014  +
09:17:00, 10 July 2014  +
09:45:00, 10 July 2014  +
At 0445 (CDT) on July 10, 2014, Browns FerAt 0445 (CDT) on July 10, 2014, Browns Ferry Unit 2 initiated actions to commence a reactor shutdown to comply with TS LCO 3.0.3. TS LCO 3.0.3 was entered at 0355 (CDT) and was required due to the 'C' Emergency Diesel Generator becoming inoperable after isolating a leak on the Emergency Equipment Cooling Water System. Currently, a 7 day TS LCO Action 3.5.1.A is in effect due to ongoing scheduled Core Spray Loop I maintenance outage. The declaration of inoperability of the equipment supported by the 'C' Emergency Diesel Generator, Core Spray Loop II, along with the redundant Core Spray system inoperable for maintenance resulted in TS LCO 3.0.3 for Unit 2. TS LCO 3.0.3 requires actions to be initiated within one hour; to place the unit in MODE 2 within 10 hours; MODE 3 within 13 hours; and MODE 4 within 37 hours.</br>This event requires a 4 hour report lAW 50.72(b)(2)(i), 'The initiation of any nuclear plant shutdown required by the plant's Technical Specifications.'</br>Actions were taken to restore the Core Spray System to Operable status and LCO 3.0.3 was exited at 0735 (CDT) on July 10, 2014.</br>The NRC Resident Inspector has been notified.</br>This event was entered into the Corrective Action Program.</br>Browns Ferry Unit 2 had reduced power to 98% when LCO 3.0.3 was exited, the power reduction was suspended, and preparations are being made to return power to 100%. There is no impact on Units 1 or 3.100%. There is no impact on Units 1 or 3.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
1.157407e-4 d (0.00278 hours, 1.653439e-5 weeks, 3.805e-6 months)  +, 1.50463e-4 d (0.00361 hours, 2.149471e-5 weeks, 4.9465e-6 months)  +, 4.282407e-4 d (0.0103 hours, 6.117725e-5 weeks, 1.40785e-5 months)  +  and 4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months)  +
00:00:00, 10 July 2014  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:19:43, 24 September 2017  +
09:17:00, 10 July 2014  +
false  +
-0.0196 d (-0.47 hours, -0.0028 weeks, -6.43806e-4 months)  +
09:45:00, 10 July 2014  +
Technical Specification Required Shutdown  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +