The Unit 1 DC Cook Nuclear Plant (CNP) PlaThe Unit 1 DC Cook Nuclear Plant (CNP) Plant Process Computer (PPC) will be removed from service on Monday, August 19, 2013 at 0900 EDT to support planned replacement. The Unit 1 PPC, including the Emergency Response Data System (ERDS), will be unavailable to the NRC Operations Center. Planned replacement also affects the Safety Parameter Display System (SPDS), the Real Time Data Repository (RDR), and PPC data to Emergency Response Facilities at CNP. Safety system annunciators and indications in the control room remain available.</br>The scheduled replacement, returning of equipment to service and post maintenance testing is expected to be completed by 2000 EDT on Saturday, September 7, 2013.</br>Compensatory measures exist within the DC Cook emergency response procedures to provide plant data via the Emergency Notification System to the NRC Operations Center until the ERDS can be returned to service.</br>The licensee has notified the NRC Resident Inspector.</br>This notification is being made in accordance with 10 CFR 50.72 (b)(3)(xiii) due to any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).</br>* * * UPDATE AT 1228 EDT ON 10/15/13 FROM BOWMAN TO HUFFMAN * * * </br>The Unit 1 DC Cook Nuclear Plant (CNP) Plant Process Computer (PPC) was restored to service on Tuesday, October 1, 2013 at 1649 EDT following the planned replacement of the PPC. The Unit 1 PPC is fully functional, including the Emergency Response Data System (ERDS), which is available to the NRC Operations Center. This also restores the Safety Parameter Display System (SPDS), the Real Time Data Repository (RDR), and PPC data to Emergency Response Facilities at CNP. </br>The licensee has notified the NRC Resident Inspector. R3DO (Duncan) notified.sident Inspector. R3DO (Duncan) notified.  +
13:00:00, 19 August 2013  +
08:46:00, 19 August 2013  +
13:00:00, 19 August 2013  +
The Unit 1 DC Cook Nuclear Plant (CNP) PlaThe Unit 1 DC Cook Nuclear Plant (CNP) Plant Process Computer (PPC) will be removed from service on Monday, August 19, 2013 at 0900 EDT to support planned replacement. The Unit 1 PPC, including the Emergency Response Data System (ERDS), will be unavailable to the NRC Operations Center. Planned replacement also affects the Safety Parameter Display System (SPDS), the Real Time Data Repository (RDR), and PPC data to Emergency Response Facilities at CNP. Safety system annunciators and indications in the control room remain available.</br>The scheduled replacement, returning of equipment to service and post maintenance testing is expected to be completed by 2000 EDT on Saturday, September 7, 2013.</br>Compensatory measures exist within the DC Cook emergency response procedures to provide plant data via the Emergency Notification System to the NRC Operations Center until the ERDS can be returned to service.</br>The licensee has notified the NRC Resident Inspector.</br>This notification is being made in accordance with 10 CFR 50.72 (b)(3)(xiii) due to any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).</br>* * * UPDATE AT 1228 EDT ON 10/15/13 FROM BOWMAN TO HUFFMAN * * * </br>The Unit 1 DC Cook Nuclear Plant (CNP) Plant Process Computer (PPC) was restored to service on Tuesday, October 1, 2013 at 1649 EDT following the planned replacement of the PPC. The Unit 1 PPC is fully functional, including the Emergency Response Data System (ERDS), which is available to the NRC Operations Center. This also restores the Safety Parameter Display System (SPDS), the Real Time Data Repository (RDR), and PPC data to Emergency Response Facilities at CNP. </br>The licensee has notified the NRC Resident Inspector. R3DO (Duncan) notified.sident Inspector. R3DO (Duncan) notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 15 October 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
01:52:57, 2 March 2018  +
08:46:00, 19 August 2013  +
false  +
-0.176 d (-4.23 hours, -0.0252 weeks, -0.00579 months)  +
13:00:00, 19 August 2013  +
Loss of Emergency Preparedness Capabilities Due to Unit 1 Ppc Replacement  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +