On 4/24/13 at 1411 EDT, a fault occurred o … On 4/24/13 at 1411 EDT, a fault occurred on the Unit 1 101 CD Reserve Auxiliary Transformer causing the 12 CD 34kV Reserve Feed Breaker to open resulting in a loss of Train A Reserve Feed to Unit 1 and Unit 2. The cause of the fault is still under investigation. </br>Unit 2 remains stable in 100% power. Unit 2 entered LCO 3.8.1, AC Source - Operating, Condition A, one required offsite circuit inoperable Restore Unit 2 reserve feed to operable status within 72 hours.</br>Unit 1 is currently in a refueling outage and offline. Unit 1 CD Emergency Diesel Generator (EDG) automatically started and loaded as expected.</br>North Spent Fuel Pit Cooling Train lost power due to a load shed, which resulted in a 2 degree Fahrenheit rise in the Spent Fuel Pool Temperature. The North Spent Fuel Pit Cooling Pump was restarted on 1 CD EDG at 1447 EDT. South Spent Fuel Pool Cooling Train remained in-service the entire time.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
18:11:00, 24 April 2013 +
48,964 +
17:15:00, 24 April 2013 +
18:11:00, 24 April 2013 +
On 4/24/13 at 1411 EDT, a fault occurred o … On 4/24/13 at 1411 EDT, a fault occurred on the Unit 1 101 CD Reserve Auxiliary Transformer causing the 12 CD 34kV Reserve Feed Breaker to open resulting in a loss of Train A Reserve Feed to Unit 1 and Unit 2. The cause of the fault is still under investigation. </br>Unit 2 remains stable in 100% power. Unit 2 entered LCO 3.8.1, AC Source - Operating, Condition A, one required offsite circuit inoperable Restore Unit 2 reserve feed to operable status within 72 hours.</br>Unit 1 is currently in a refueling outage and offline. Unit 1 CD Emergency Diesel Generator (EDG) automatically started and loaded as expected.</br>North Spent Fuel Pit Cooling Train lost power due to a load shed, which resulted in a 2 degree Fahrenheit rise in the Spent Fuel Pool Temperature. The North Spent Fuel Pit Cooling Pump was restarted on 1 CD EDG at 1447 EDT. South Spent Fuel Pool Cooling Train remained in-service the entire time.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 24 April 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:01:12, 2 March 2018 +
17:15:00, 24 April 2013 +
false +
-0.0388 d (-0.93 hours, -0.00554 weeks, -0.00127 months) +
18:11:00, 24 April 2013 +
Valid Actuation of an Emergency Diesel Generator Due to a Loss of Train a Reserve Feed to the Site +