On April 17, 2013 at 1600 (EDT), while per … On April 17, 2013 at 1600 (EDT), while performing a valve inspection/repair of the Unit 2 'A' Reactor Coolant Loop Fill Valve (2- RC-HCV-2556A), the as-found inspection results identified evidence of a suspected flaw causing leakage from the valve body to the threads of a stud housing of the valve. This valve is a 2 (inch) 316 SS (Stainless Steel) cast ASME XI (Class 1) 1500 psi valve body of a globe style design. Due to this design and the installed orientation, the RCS pressure medium fills the upper portion of the valve bonnet where the leak is located during normal plant operations. Therefore, this leakage would be considered pressure boundary leakage. 2-RC-HCV-2556A is currently isolated from the Reactor Vessel and is at atmospheric pressure.</br>This inspection was performed in response to dry discolored boric acid identified during the normal operating pressure boric acid accumulation inspection procedure during the Spring 2013 Unit 2 refueling outage shutdown. An engineering evaluation of the suspected defect will be performed and corrective actions implemented.</br>This event is reportable in accordance to 10CFR50.72(b)(3)(ii)(A) for, 'Any event or condition that results in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded'.</br>The licensee notified the NRC Resident Inspector and local County Commissioners.</br>* * * RETRACTION FROM BOB PAGE TO CHARLES TEAL ON 6/12/13 AT 1109 EDT * * *</br>Event Number 48940 was made on April 17, 2013 in accordance with 10CFR50.72(b)(3)(ii)(A) to document a suspected flaw resulting in RCS pressure boundary leakage on Unit 2 'A' Reactor Coolant Loop Fill Valve (2-RC-HCV-2556A). North Anna Power Station is retracting this notification following completion of a cause analysis and metallurgical examination. The analysis determined that the valve leakage was due to the body-to-bonnet gasket joint. The original valve body was especially susceptible to gasket creep, which lead to a loss of sufficient sealing stress. This resulted in body-to-bonnet leakage, not a through-wall leak. Based on this analysis, the reporting requirements of 10CFR50.72(b)(3)(ii)(A) are not met and this event report is being retracted.</br>The licensee has notified the NRC Resident Inspector.</br>Notified R2DO (Ehrhardt).ident Inspector.
Notified R2DO (Ehrhardt).
20:00:00, 17 April 2013 +
48,940 +
23:19:00, 17 April 2013 +
20:00:00, 17 April 2013 +
On April 17, 2013 at 1600 (EDT), while per … On April 17, 2013 at 1600 (EDT), while performing a valve inspection/repair of the Unit 2 'A' Reactor Coolant Loop Fill Valve (2- RC-HCV-2556A), the as-found inspection results identified evidence of a suspected flaw causing leakage from the valve body to the threads of a stud housing of the valve. This valve is a 2 (inch) 316 SS (Stainless Steel) cast ASME XI (Class 1) 1500 psi valve body of a globe style design. Due to this design and the installed orientation, the RCS pressure medium fills the upper portion of the valve bonnet where the leak is located during normal plant operations. Therefore, this leakage would be considered pressure boundary leakage. 2-RC-HCV-2556A is currently isolated from the Reactor Vessel and is at atmospheric pressure.</br>This inspection was performed in response to dry discolored boric acid identified during the normal operating pressure boric acid accumulation inspection procedure during the Spring 2013 Unit 2 refueling outage shutdown. An engineering evaluation of the suspected defect will be performed and corrective actions implemented.</br>This event is reportable in accordance to 10CFR50.72(b)(3)(ii)(A) for, 'Any event or condition that results in the condition of the nuclear power plant, including its principal safety barriers, being seriously degraded'.</br>The licensee notified the NRC Resident Inspector and local County Commissioners.</br>* * * RETRACTION FROM BOB PAGE TO CHARLES TEAL ON 6/12/13 AT 1109 EDT * * *</br>Event Number 48940 was made on April 17, 2013 in accordance with 10CFR50.72(b)(3)(ii)(A) to document a suspected flaw resulting in RCS pressure boundary leakage on Unit 2 'A' Reactor Coolant Loop Fill Valve (2-RC-HCV-2556A). North Anna Power Station is retracting this notification following completion of a cause analysis and metallurgical examination. The analysis determined that the valve leakage was due to the body-to-bonnet gasket joint. The original valve body was especially susceptible to gasket creep, which lead to a loss of sufficient sealing stress. This resulted in body-to-bonnet leakage, not a through-wall leak. Based on this analysis, the reporting requirements of 10CFR50.72(b)(3)(ii)(A) are not met and this event report is being retracted.</br>The licensee has notified the NRC Resident Inspector.</br>Notified R2DO (Ehrhardt).ident Inspector.
Notified R2DO (Ehrhardt).
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 12 June 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:00:44, 2 March 2018 +
23:19:00, 17 April 2013 +
false +
false +
0.138 d (3.32 hours, 0.0198 weeks, 0.00455 months) +
20:00:00, 17 April 2013 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.