On Saturday, January 12, 2013 at 0925 hour … On Saturday, January 12, 2013 at 0925 hours (EST), with the reactor shutdown at 0% core thermal power, a security threat was reported. Security personnel took action to investigate the threat and implemented appropriate protective actions as required per security procedures.</br>Based on this security event, the Shift Manager activated the Emergency Plan and made notification of an Unusual Event at 0950 hours. As a result, the Emergency Response organization was notified and activated. At 1001 hours, the NRC and applicable state and local authorities were notified via the Emergency Notification System (ENS).</br>At 1050 hours, Security and applicable local law enforcement agency officials completed immediate investigations and determined that the security threat was not credible and was the result of local duck hunters on a small watercraft near the plant site. At 1105 hours, the Emergency Director terminated the Unusual Event.</br>The Senior Resident Inspector was on-site and has been informed of this event and associated offsite notification. The licensee has notified appropriate state and local authorities as required per Emergency Planning and other site specific procedures. A press release was also issued.</br>This notification is being made in accordance with 10CFR50.72(b)(2)(xi).</br>Notified the DHS SWO, FEMA and DHS NICC.</br>* * * UPDATE FROM HETTWER TO S. SANDIN ON 01/25/13 AT 1101 EST * * * </br>This is an informational update to notification EN# 48669 based on completion of the post event Emergency Planning review.</br>Our initial notification contained the following documentation error: At 1001 hours, the NRC and applicable State and Local authorities were notified via the Emergency Notification System (ENS). This statement is corrected as follows: 'At 1001 hours, State and Local authorities were notified via the Dedicated Notification Network (DNN). At 1025 hours, the NRC was notified via the Emergency Notification System (ENS).'</br>The Resident Inspector has been informed of this event update.</br>Notified R1DO (Ferdas).this event update.
Notified R1DO (Ferdas).
14:50:00, 12 January 2013 +
10:21:00, 12 January 2013 +
14:50:00, 12 January 2013 +
On Saturday, January 12, 2013 at 0925 hour … On Saturday, January 12, 2013 at 0925 hours (EST), with the reactor shutdown at 0% core thermal power, a security threat was reported. Security personnel took action to investigate the threat and implemented appropriate protective actions as required per security procedures.</br>Based on this security event, the Shift Manager activated the Emergency Plan and made notification of an Unusual Event at 0950 hours. As a result, the Emergency Response organization was notified and activated. At 1001 hours, the NRC and applicable state and local authorities were notified via the Emergency Notification System (ENS).</br>At 1050 hours, Security and applicable local law enforcement agency officials completed immediate investigations and determined that the security threat was not credible and was the result of local duck hunters on a small watercraft near the plant site. At 1105 hours, the Emergency Director terminated the Unusual Event.</br>The Senior Resident Inspector was on-site and has been informed of this event and associated offsite notification. The licensee has notified appropriate state and local authorities as required per Emergency Planning and other site specific procedures. A press release was also issued.</br>This notification is being made in accordance with 10CFR50.72(b)(2)(xi).</br>Notified the DHS SWO, FEMA and DHS NICC.</br>* * * UPDATE FROM HETTWER TO S. SANDIN ON 01/25/13 AT 1101 EST * * * </br>This is an informational update to notification EN# 48669 based on completion of the post event Emergency Planning review.</br>Our initial notification contained the following documentation error: At 1001 hours, the NRC and applicable State and Local authorities were notified via the Emergency Notification System (ENS). This statement is corrected as follows: 'At 1001 hours, State and Local authorities were notified via the Dedicated Notification Network (DNN). At 1025 hours, the NRC was notified via the Emergency Notification System (ENS).'</br>The Resident Inspector has been informed of this event update.</br>Notified R1DO (Ferdas).this event update.
Notified R1DO (Ferdas).
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0107 d (0.257 hours, 0.00153 weeks, 3.519625e-4 months) +, 0.011 d (0.264 hours, 0.00157 weeks, 3.61475e-4 months) +, 0.0116 d (0.278 hours, 0.00166 weeks, 3.808805e-4 months) +, 0.0122 d (0.292 hours, 0.00174 weeks, 3.99525e-4 months) +, 0.0128 d (0.307 hours, 0.00183 weeks, 4.204525e-4 months) + and 0.0119 d (0.285 hours, 0.00169 weeks, 3.900125e-4 months) +
00:00:00, 25 January 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:01:57, 2 March 2018 +
10:21:00, 12 January 2013 +
false +
false +
-0.187 d (-4.48 hours, -0.0267 weeks, -0.00614 months) +
14:50:00, 12 January 2013 +