On October 7, 2012, with Unit 2 in a defue … On October 7, 2012, with Unit 2 in a defueled condition, a differential current lockout occurred on the 2B3 4.16kV essential bus, causing a deenergization of the 2B3 4.16kV essential bus. At the time of the event, the 2B Emergency Diesel Generator (EDG) was loaded to the essential bus. Due to the differential current lockout, all bus loads were lost and the 2B EDG output breaker feeding the essential bus opened and the 2B EDG transferred to emergency mode. The 2A EDG is operable and in standby. All equipment responded as expected. The plant is currently being maintained in a defueled condition. Decay heat removal is being supplied by the 2A Fuel Pool Cooling train. The cause of the differential current lockout of the 2B3 4.16kv bus is under investigation.</br>This event is reportable pursuant to 10CFR 50.72(b)(3)(iv)(A).</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
01:40:00, 8 October 2012 +
02:37:00, 8 October 2012 +
01:40:00, 8 October 2012 +
On October 7, 2012, with Unit 2 in a defue … On October 7, 2012, with Unit 2 in a defueled condition, a differential current lockout occurred on the 2B3 4.16kV essential bus, causing a deenergization of the 2B3 4.16kV essential bus. At the time of the event, the 2B Emergency Diesel Generator (EDG) was loaded to the essential bus. Due to the differential current lockout, all bus loads were lost and the 2B EDG output breaker feeding the essential bus opened and the 2B EDG transferred to emergency mode. The 2A EDG is operable and in standby. All equipment responded as expected. The plant is currently being maintained in a defueled condition. Decay heat removal is being supplied by the 2A Fuel Pool Cooling train. The cause of the differential current lockout of the 2B3 4.16kv bus is under investigation.</br>This event is reportable pursuant to 10CFR 50.72(b)(3)(iv)(A).</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 October 2012 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:24:08, 24 September 2017 +
02:37:00, 8 October 2012 +
false +
false +
0.0396 d (0.95 hours, 0.00565 weeks, 0.0013 months) +
01:40:00, 8 October 2012 +