On September 25, 2012, power was removed fOn September 25, 2012, power was removed from various Technical Support Center (TSC) systems to perform planned system preventative maintenance (PM) and corrective maintenance (CM) activities. During these maintenance activities, the normal TSC and Operational Support Center (OSC) are unavailable for use during an emergency. The Plant Data Network (PDN) will not be available to the TSC. This will render the Safety Parameter Display System (SPDS), Emergency Response Facility Display System (ERFDS), Emergency Assessment and Response System (EARS) and the Post LOCA Sampling System in the TSC unavailable. System alarms and data displays will still be available to the plant operators in the Control Room. The expected duration of the power outage is approximately 39 hours.</br>As compensatory measures, the backup emergency response facilities will be manned during an emergency. This compensatory measure has been communicated to the emergency response organization. It is expected that appropriate assessment of plant conditions, notifications, and communications could still be made, if required, during the time that the normal TSC and OSC are unavailable. This report is being made in accordance with 10 CFR 50.72(b)(3)(xiii), which is any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability. An update message will be provided when the emergency response facilities are restored.</br>The licensee will notify the NRC Resident Inspector.</br>* * * UPDATE FROM GOELZER TO KLCO ON 9/27/12 AT 0025 EDT * * * </br>This is an update to EN #48339 report on September 25, 2012, where Pacific Gas & Electric company (PG&E) reported that a planned maintenance power outage caused the normal Technical Support Center (TSC) and Operational Support Center (OSC) to be unavailable for use during an emergency. </br>PG&E has completed all preventative maintenance (PM) and corrective maintenance (CM) activities that required the power outage to the TSC and OSC and has completed the restoration of these emergency response facilities. Plant personnel have been notified that the normal emergency response facilities have been restored. </br>PG&E personnel have informed the NRC Resident Inspector.</br>Notified the R4DO (Werner).ed the NRC Resident Inspector. Notified the R4DO (Werner).  
12:55:00, 25 September 2012  +
48,339  +
09:46:00, 25 September 2012  +
12:55:00, 25 September 2012  +
On September 25, 2012, power was removed fOn September 25, 2012, power was removed from various Technical Support Center (TSC) systems to perform planned system preventative maintenance (PM) and corrective maintenance (CM) activities. During these maintenance activities, the normal TSC and Operational Support Center (OSC) are unavailable for use during an emergency. The Plant Data Network (PDN) will not be available to the TSC. This will render the Safety Parameter Display System (SPDS), Emergency Response Facility Display System (ERFDS), Emergency Assessment and Response System (EARS) and the Post LOCA Sampling System in the TSC unavailable. System alarms and data displays will still be available to the plant operators in the Control Room. The expected duration of the power outage is approximately 39 hours.</br>As compensatory measures, the backup emergency response facilities will be manned during an emergency. This compensatory measure has been communicated to the emergency response organization. It is expected that appropriate assessment of plant conditions, notifications, and communications could still be made, if required, during the time that the normal TSC and OSC are unavailable. This report is being made in accordance with 10 CFR 50.72(b)(3)(xiii), which is any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability. An update message will be provided when the emergency response facilities are restored.</br>The licensee will notify the NRC Resident Inspector.</br>* * * UPDATE FROM GOELZER TO KLCO ON 9/27/12 AT 0025 EDT * * * </br>This is an update to EN #48339 report on September 25, 2012, where Pacific Gas & Electric company (PG&E) reported that a planned maintenance power outage caused the normal Technical Support Center (TSC) and Operational Support Center (OSC) to be unavailable for use during an emergency. </br>PG&E has completed all preventative maintenance (PM) and corrective maintenance (CM) activities that required the power outage to the TSC and OSC and has completed the restoration of these emergency response facilities. Plant personnel have been notified that the normal emergency response facilities have been restored. </br>PG&E personnel have informed the NRC Resident Inspector.</br>Notified the R4DO (Werner).ed the NRC Resident Inspector. Notified the R4DO (Werner).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
4.513889e-4 d (0.0108 hours, 6.448413e-5 weeks, 1.48395e-5 months)  +
00:00:00, 27 September 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:02:58, 2 March 2018  +
09:46:00, 25 September 2012  +
false  +
-0.131 d (-3.15 hours, -0.0187 weeks, -0.00431 months)  +
12:55:00, 25 September 2012  +
Technical Support Center Removed from Service for Maintenance  +