Browse wiki

Jump to navigation Jump to search
On June 6, 2012, at approximately 0612 houOn June 6, 2012, at approximately 0612 hours, Indian Point Unit 2 reactor automatically tripped from 100% steady state power due to a turbine-main generator electrical trip. All rods fully inserted. Investigation into the generator trip is in progress. All systems responded as expected. The Auxiliary Feedwater system actuated and responded as expected and is maintaining steam generator levels. Decay heat removal is via the steam generators to the main condenser. Offsite power and plant electrical lineups are normal. No primary or secondary code safety relief valves lifted. The reactor is in Mode 3 and stable. Unit 3 was unaffected and remains at 100% power.</br>The NRC Resident Inspector has been notified, and the licensee issued a press release., and the licensee issued a press release.  +
10:12:00, 6 June 2012  +
47,999  +
09:38:00, 6 June 2012  +
10:12:00, 6 June 2012  +
On June 6, 2012, at approximately 0612 houOn June 6, 2012, at approximately 0612 hours, Indian Point Unit 2 reactor automatically tripped from 100% steady state power due to a turbine-main generator electrical trip. All rods fully inserted. Investigation into the generator trip is in progress. All systems responded as expected. The Auxiliary Feedwater system actuated and responded as expected and is maintaining steam generator levels. Decay heat removal is via the steam generators to the main condenser. Offsite power and plant electrical lineups are normal. No primary or secondary code safety relief valves lifted. The reactor is in Mode 3 and stable. Unit 3 was unaffected and remains at 100% power.</br>The NRC Resident Inspector has been notified, and the licensee issued a press release., and the licensee issued a press release.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.00708 d (0.17 hours, 0.00101 weeks, 2.32866e-4 months)  +
100  +
00:00:00, 6 June 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:03:58, 2 March 2018  +
09:38:00, 6 June 2012  +
-0.0238 d (-0.57 hours, -0.00339 weeks, -7.80786e-4 months)  +
10:12:00, 6 June 2012  +
Unit 2 Experienced an Automatic Reactor Trip on Turbine Main Generator Trip  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +