At 0639 CDT on 5/24/2012. Unit 3 initiatedAt 0639 CDT on 5/24/2012. Unit 3 initiated a manual scram due to multiple rods inserting. At 0637 CDT during Unit 3 start-up Intermediate Range Monitor (IRM) 'H' was ranged down instead of up resulting in half scram on Reactor Protection System (RPS) 'B' trip system. The half scram was being reset after IRM 'H' was properly ranged. The operator placed the scram reset switch in Group 2/3 position. As the operator reset groups 2 and 3, a spike on IRM 'A' was received on the RPS 'A' trip system, resulting in rod insertion for groups 1 and 4. When the operator identified multiple rods inserting, the actions of procedure 3-AOI-l00-1 were followed and a manual scram was inserted. Investigation is ongoing.</br>All safety systems remained in standby readiness configuration. No Emergency Core Cooling System (ECCS) or Reactor Core Isolation Cooling (RCIC) reactor water level initiation set points were reached. Primary Containment lsolations Systems did not received actuation signals and performed as designed.</br>This event is reportable within 4 hours per 10 CFR 50.72(b)(2)(iv)(B) 'any event or condition that results in actuation of the RPS when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.' It is also reportable within 8 hours per 10 CFR 50.72(b)(3)(iv)(A) 'any event or condition that results in valid actuation of systems listed in paragraph (b)(3)(iv)(B) 'Reactor Protection System (RPS) Including reactor scram and reactor trip.' This event requires an LER within 60 days per 10 CFR 50.73(a)(2)(iv)(A).</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
11:39:00, 24 May 2012  +
47,955  +
11:10:00, 24 May 2012  +
11:39:00, 24 May 2012  +
At 0639 CDT on 5/24/2012. Unit 3 initiatedAt 0639 CDT on 5/24/2012. Unit 3 initiated a manual scram due to multiple rods inserting. At 0637 CDT during Unit 3 start-up Intermediate Range Monitor (IRM) 'H' was ranged down instead of up resulting in half scram on Reactor Protection System (RPS) 'B' trip system. The half scram was being reset after IRM 'H' was properly ranged. The operator placed the scram reset switch in Group 2/3 position. As the operator reset groups 2 and 3, a spike on IRM 'A' was received on the RPS 'A' trip system, resulting in rod insertion for groups 1 and 4. When the operator identified multiple rods inserting, the actions of procedure 3-AOI-l00-1 were followed and a manual scram was inserted. Investigation is ongoing.</br>All safety systems remained in standby readiness configuration. No Emergency Core Cooling System (ECCS) or Reactor Core Isolation Cooling (RCIC) reactor water level initiation set points were reached. Primary Containment lsolations Systems did not received actuation signals and performed as designed.</br>This event is reportable within 4 hours per 10 CFR 50.72(b)(2)(iv)(B) 'any event or condition that results in actuation of the RPS when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.' It is also reportable within 8 hours per 10 CFR 50.72(b)(3)(iv)(A) 'any event or condition that results in valid actuation of systems listed in paragraph (b)(3)(iv)(B) 'Reactor Protection System (RPS) Including reactor scram and reactor trip.' This event requires an LER within 60 days per 10 CFR 50.73(a)(2)(iv)(A).</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
4.62963e-5 d (0.00111 hours, 6.613757e-6 weeks, 1.522e-6 months)  +  and 9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months)  +
00:00:00, 24 May 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:25:13, 24 September 2017  +
11:10:00, 24 May 2012  +
true  +
-0.02 d (-0.48 hours, -0.00286 weeks, -6.57504e-4 months)  +
11:39:00, 24 May 2012  +
Reactor Scram During Startup  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
3  +