Browse wiki

Jump to navigation Jump to search
100  +
At 0900 (CDT) on May 8, 2012, it was deterAt 0900 (CDT) on May 8, 2012, it was determined that Monticello Nuclear Generating Plant did not meet Technical Specification Limiting Condition for Operation 3.3.8.1 because the requirement of Table 3.3.8.1-1 for the 4.16 KV Essential Bus Degraded Voltage time delay transfer to the Emergency Diesel Generators (EDGs) of 9.2 seconds could not be met under all postulated conditions. The degraded transfer scheme has the ability to transfer to an intermediate offsite source (1AR) which under a degraded voltage condition, coincident with an accident, would delay the transfer to the EDGs an additional 5 seconds. Both EDGs were subsequently declared inoperable.</br>As an interim action 1AR transformer has been removed from service. This eliminates the unanalyzed condition, restores Technical Specification compliance, and restores both EDGs to an operable condition.</br>Additionally this event is being reported under criteria 10 CFR 50.72(b)(3)(v)(D) - Accident Mitigation.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
14:00:00, 8 May 2012  +
47,909  +
17:06:00, 8 May 2012  +
14:00:00, 8 May 2012  +
At 0900 (CDT) on May 8, 2012, it was deterAt 0900 (CDT) on May 8, 2012, it was determined that Monticello Nuclear Generating Plant did not meet Technical Specification Limiting Condition for Operation 3.3.8.1 because the requirement of Table 3.3.8.1-1 for the 4.16 KV Essential Bus Degraded Voltage time delay transfer to the Emergency Diesel Generators (EDGs) of 9.2 seconds could not be met under all postulated conditions. The degraded transfer scheme has the ability to transfer to an intermediate offsite source (1AR) which under a degraded voltage condition, coincident with an accident, would delay the transfer to the EDGs an additional 5 seconds. Both EDGs were subsequently declared inoperable.</br>As an interim action 1AR transformer has been removed from service. This eliminates the unanalyzed condition, restores Technical Specification compliance, and restores both EDGs to an operable condition.</br>Additionally this event is being reported under criteria 10 CFR 50.72(b)(3)(v)(D) - Accident Mitigation.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 8 May 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:13, 2 March 2018  +
17:06:00, 8 May 2012  +
false  +
0.129 d (3.1 hours, 0.0185 weeks, 0.00425 months)  +
14:00:00, 8 May 2012  +
an Unanalyzed Condition Could Delay Transfer to Emergency Diesel Generators Under Certain Postulated Conditions  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +