Browse wiki

Jump to navigation Jump to search
100  +
At 0756 (EST) on 2/12/12, an electrical evAt 0756 (EST) on 2/12/12, an electrical event occurred in the 161 kV switchyard that resulted in bus differential relay operating, and opening all PCBs (Protective Circuit Breakers) within 161 kV bus 2-2. Shortly after, a call was received from site security regarding an explosion in the switchyard. </br>At 0820, a report was received that visible damage was present on an insulator between a PCB and a Motor Operated Disconnect (MOD) in the 161 kV switchyard, which is where the fault occurred. Follow up reports indicated an oil leak from a current transformer. Two other PCBs were identified to have visible damage. After the event, while opening MODS for PCBs that tripped open, the 'A' phase for one MOD did not open.</br>No safety related equipment required to establish or maintain safe shutdown was affected. All the Diesel Generators remain in operable standby conditions.</br>Unit 1 remained steady at 100% with no transients.</br>Unit 2 had a 2B Condenser Circ Water pump trip off. Crew responded to the pump trip and Unit 2 remains at 100%.</br>One offsite power source is inoperable and second offsite power source has been verified operable. Grid status is Yellow.</br>There were no personnel injuries reported due to the fault and resulting explosion. The loss of the offsite power source resulted in the licensee entering a 72-hr. LCO. The licensee is investigating both the cause of loss of offsite power and the circulating water pump trip.</br>The licensee has notified the State of Tennessee and the NRC Resident Inspector.</br>* * * UPDATE FROM KEVIN WILKES TO HOWIE CROUCH AT 1056 EST ON 2/12/12 * * *</br>At 1019 EST, the licensee terminated their Notification of Unusual Event. The basis for termination was that the fault was cleared and the conditions for EAL entry no longer exists.</br>The licensee has made state and local notifications and has notified the NRC Resident Inspector.</br>Notified R2DO (Calle), IRD (Kozal), NRR (Evans), DHS (Beach), FEMA (Fuller), and NICC (Berger) (Beach), FEMA (Fuller), and NICC (Berger)  +
13:34:00, 12 February 2012  +
47,660  +
09:26:00, 12 February 2012  +
13:34:00, 12 February 2012  +
At 0756 (EST) on 2/12/12, an electrical evAt 0756 (EST) on 2/12/12, an electrical event occurred in the 161 kV switchyard that resulted in bus differential relay operating, and opening all PCBs (Protective Circuit Breakers) within 161 kV bus 2-2. Shortly after, a call was received from site security regarding an explosion in the switchyard. </br>At 0820, a report was received that visible damage was present on an insulator between a PCB and a Motor Operated Disconnect (MOD) in the 161 kV switchyard, which is where the fault occurred. Follow up reports indicated an oil leak from a current transformer. Two other PCBs were identified to have visible damage. After the event, while opening MODS for PCBs that tripped open, the 'A' phase for one MOD did not open.</br>No safety related equipment required to establish or maintain safe shutdown was affected. All the Diesel Generators remain in operable standby conditions.</br>Unit 1 remained steady at 100% with no transients.</br>Unit 2 had a 2B Condenser Circ Water pump trip off. Crew responded to the pump trip and Unit 2 remains at 100%.</br>One offsite power source is inoperable and second offsite power source has been verified operable. Grid status is Yellow.</br>There were no personnel injuries reported due to the fault and resulting explosion. The loss of the offsite power source resulted in the licensee entering a 72-hr. LCO. The licensee is investigating both the cause of loss of offsite power and the circulating water pump trip.</br>The licensee has notified the State of Tennessee and the NRC Resident Inspector.</br>* * * UPDATE FROM KEVIN WILKES TO HOWIE CROUCH AT 1056 EST ON 2/12/12 * * *</br>At 1019 EST, the licensee terminated their Notification of Unusual Event. The basis for termination was that the fault was cleared and the conditions for EAL entry no longer exists.</br>The licensee has made state and local notifications and has notified the NRC Resident Inspector.</br>Notified R2DO (Calle), IRD (Kozal), NRR (Evans), DHS (Beach), FEMA (Fuller), and NICC (Berger) (Beach), FEMA (Fuller), and NICC (Berger)  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 12 February 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:53, 2 March 2018  +
09:26:00, 12 February 2012  +
false  +
-0.172 d (-4.13 hours, -0.0246 weeks, -0.00566 months)  +
13:34:00, 12 February 2012  +
Unusual Event Due to Electrical Fault in 161 Kv Switchyard  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +  and 2  +