Browse wiki

Jump to navigation Jump to search
100  +
During NFPA-805 Fire PRA (Probabilistic RiDuring NFPA-805 Fire PRA (Probabilistic Risk Assessment) model development, Ginna Station identified a non-compliance with the Appendix R requirement to maintain one train of systems that are necessary to achieve and maintain hot shutdown and remain free from fire damage. A fire in the Turbine Building could cause a loss of 4160V power to the 480V safeguards buses while disabling control power to the 480V bus normal supply breakers and preventing both diesel generator output breakers from closing. Since the non-safety related 4160V buses are located in the same area of the turbine building, this could potentially impact both trains of AC power. This was determined to be an unanalyzed condition reportable in accordance with 10CFR50.72(b)(3)(ii)(B). Compensatory measures have been established to provide interim guidance to identify the condition and locally trip the bus supply breaker prior to closing the diesel generator output breaker.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector.  +
14:00:00, 18 August 2011  +
47,167  +
16:11:00, 18 August 2011  +
14:00:00, 18 August 2011  +
During NFPA-805 Fire PRA (Probabilistic RiDuring NFPA-805 Fire PRA (Probabilistic Risk Assessment) model development, Ginna Station identified a non-compliance with the Appendix R requirement to maintain one train of systems that are necessary to achieve and maintain hot shutdown and remain free from fire damage. A fire in the Turbine Building could cause a loss of 4160V power to the 480V safeguards buses while disabling control power to the 480V bus normal supply breakers and preventing both diesel generator output breakers from closing. Since the non-safety related 4160V buses are located in the same area of the turbine building, this could potentially impact both trains of AC power. This was determined to be an unanalyzed condition reportable in accordance with 10CFR50.72(b)(3)(ii)(B). Compensatory measures have been established to provide interim guidance to identify the condition and locally trip the bus supply breaker prior to closing the diesel generator output breaker.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 18 August 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:06:18, 2 March 2018  +
16:11:00, 18 August 2011  +
false  +
0.0908 d (2.18 hours, 0.013 weeks, 0.00299 months)  +
14:00:00, 18 August 2011  +
Unanalyzed Condition That Could Potentially Impact Both Trains of 480V Safeguards Buses  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +