Browse wiki

Jump to navigation Jump to search
100  +
The Emergency Plant Information Computer (The Emergency Plant Information Computer (EPIC) has been shutdown for planned maintenance. The maintenance is expected to last less than six (6) hours. The shutdown of EPIC has caused a loss of the Safety Parameter Display System (SPDS) and Emergency Response Data System (ERDS). This is determined to be a partial, but significant Loss of Emergency Assessment Capability, and is an 8-hr. Non-Emergency 10 CFR 50.72(b)(3)(xiii) required notification.</br>There are no plant transients or power maneuvers in progress or planned.</br>Actions taken include: performance of the site specific Computer Out-of-service Surveillance (ST-40C) which provides for enhanced Control Room parameter monitoring, additional operating rounds in-plant on a recurring basis, and restriction of scheduled activities that could cause a plant transient. Members of the JAF (James A Fitzpatrick) Emergency Response Organization (ERO) have been briefed on contingencies required during an E-Plan (Emergency Plan) activation. A contingency plan for around the clock maintenance coverage to recover the EPIC if it is not restored as scheduled does exists.</br>The licensee has notified the State, the County, and the NRC Resident Inspector.he County, and the NRC Resident Inspector.  +
14:22:00, 11 July 2011  +
47,042  +
10:58:00, 11 July 2011  +
14:22:00, 11 July 2011  +
The Emergency Plant Information Computer (The Emergency Plant Information Computer (EPIC) has been shutdown for planned maintenance. The maintenance is expected to last less than six (6) hours. The shutdown of EPIC has caused a loss of the Safety Parameter Display System (SPDS) and Emergency Response Data System (ERDS). This is determined to be a partial, but significant Loss of Emergency Assessment Capability, and is an 8-hr. Non-Emergency 10 CFR 50.72(b)(3)(xiii) required notification.</br>There are no plant transients or power maneuvers in progress or planned.</br>Actions taken include: performance of the site specific Computer Out-of-service Surveillance (ST-40C) which provides for enhanced Control Room parameter monitoring, additional operating rounds in-plant on a recurring basis, and restriction of scheduled activities that could cause a plant transient. Members of the JAF (James A Fitzpatrick) Emergency Response Organization (ERO) have been briefed on contingencies required during an E-Plan (Emergency Plan) activation. A contingency plan for around the clock maintenance coverage to recover the EPIC if it is not restored as scheduled does exists.</br>The licensee has notified the State, the County, and the NRC Resident Inspector.he County, and the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 11 July 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:06:39, 2 March 2018  +
10:58:00, 11 July 2011  +
false  +
-0.142 d (-3.4 hours, -0.0202 weeks, -0.00466 months)  +
14:22:00, 11 July 2011  +
Temporary Loss of Erds and Spds Due to Planned Maintenance  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +