Browse wiki

Jump to navigation Jump to search
WBN Unit 1 initiated a Tech Spec required WBN Unit 1 initiated a Tech Spec required shutdown at 2254 on 11/05/08. The plant entered TS 3.0.3 at 2135 on 11/05/08 due to both trains of Control Room Emergency Air Temperature Control (CREATCS) being declared inoperable. Initially Train 'B' CREATCS was inoperable due to the scheduled maintenance of Train 'B' auxiliary air system. With one train of Aux Air inoperable this renders that respective train of CREATCS inoperable. During this planned maintenance the 'A' train CREATCS chiller lost ability to cool the Main Control Room due to a failure in the control circuitry. This rendered 'A' train inoperable which led to entry into TS 3.0.3 for both trains CREATCS being inoperable. The plant exited TS 3.0.3 at 2345 on 11/05/08 upon completion of Post Maintenance Testing on the train 'B' Aux Air system and return to operability of the 'B' train Aux Air and therefore the 'B' train of CREATCS. The planned plant shutdown was stopped upon exit of TS 3.0.3 at 2345 11/05/08 and Rx power restored to 100%.</br>The licensee notified the NRC Resident Inspectorcensee notified the NRC Resident Inspector  +
03:54:00, 6 November 2008  +
44,632  +
00:59:00, 6 November 2008  +
03:54:00, 6 November 2008  +
WBN Unit 1 initiated a Tech Spec required WBN Unit 1 initiated a Tech Spec required shutdown at 2254 on 11/05/08. The plant entered TS 3.0.3 at 2135 on 11/05/08 due to both trains of Control Room Emergency Air Temperature Control (CREATCS) being declared inoperable. Initially Train 'B' CREATCS was inoperable due to the scheduled maintenance of Train 'B' auxiliary air system. With one train of Aux Air inoperable this renders that respective train of CREATCS inoperable. During this planned maintenance the 'A' train CREATCS chiller lost ability to cool the Main Control Room due to a failure in the control circuitry. This rendered 'A' train inoperable which led to entry into TS 3.0.3 for both trains CREATCS being inoperable. The plant exited TS 3.0.3 at 2345 on 11/05/08 upon completion of Post Maintenance Testing on the train 'B' Aux Air system and return to operability of the 'B' train Aux Air and therefore the 'B' train of CREATCS. The planned plant shutdown was stopped upon exit of TS 3.0.3 at 2345 11/05/08 and Rx power restored to 100%.</br>The licensee notified the NRC Resident Inspectorcensee notified the NRC Resident Inspector  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 6 November 2008  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:13:15, 2 March 2018  +
00:59:00, 6 November 2008  +
false  +
-0.122 d (-2.92 hours, -0.0174 weeks, -0.004 months)  +
03:54:00, 6 November 2008  +
Both Trains of Control Room Emergency Air Temperature Control Declared Inop  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +