WBN Unit 1 initiated a Tech Spec required shutdown at 2254 on 11/05/08. The plant entered
TS 3.0.3 at 2135 on 11/05/08 due to both trains of Control Room Emergency Air Temperature Control (
CREATCS) being declared
inoperable. Initially Train 'B'
CREATCS was
inoperable due to the scheduled maintenance of Train 'B' auxiliary air system. With one train of Aux Air
inoperable this renders that respective train of
CREATCS inoperable. During this planned maintenance the 'A' train
CREATCS chiller lost ability to cool the Main Control Room due to a failure in the control circuitry. This rendered 'A' train
inoperable which led to entry into
TS 3.0.3 for both trains
CREATCS being
inoperable. The plant exited
TS 3.0.3 at 2345 on 11/05/08 upon completion of Post Maintenance Testing on the train 'B' Aux Air system and return to operability of the 'B' train Aux Air and therefore the 'B' train of
CREATCS. The planned plant shutdown was stopped upon exit of
TS 3.0.3 at 2345 11/05/08 and Rx power restored to 100%.
The licensee notified the NRC Resident Inspector