This is all eight-hour non-emergency reporThis is all eight-hour non-emergency reportable event to the NRCOC in accordance with 10 CFR 50.72 (b)(3)(v)(D) for a condition that could have prevented the fulfillment of a safety function.</br>High Head Safety Injection (HHSI) pump discharge to cold leg injection isolation valve 4-867 was discovered out of position while in a refueling outage (4-24.) The valve was discovered out of position on 5/5/08 at 12:37 and placed in its correct position, locked open and back-seated, at 13:07. Valve 4-867 is required to be locked open and back-seated when the reactor coolant system (RCS) temperature is greater than 380 degrees F, per Technical Specification 3.5.2. Unit 4 was in Technical Specification 3.0.3 (no OPERABLE cold leg injection flowpath for all HHSI pumps to Unit 4) for 30 minutes from time of discovery at 12:37 until correction at 13:07. Valve 4-867 was out of its required position for 5 hours and 26 minutes when the RCS was above 380 degrees F at 07:41 until it was correctly repositioned at 13:07.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
16:37:00, 5 May 2008  +
44,188  +
17:03:00, 5 May 2008  +
16:37:00, 5 May 2008  +
This is all eight-hour non-emergency reporThis is all eight-hour non-emergency reportable event to the NRCOC in accordance with 10 CFR 50.72 (b)(3)(v)(D) for a condition that could have prevented the fulfillment of a safety function.</br>High Head Safety Injection (HHSI) pump discharge to cold leg injection isolation valve 4-867 was discovered out of position while in a refueling outage (4-24.) The valve was discovered out of position on 5/5/08 at 12:37 and placed in its correct position, locked open and back-seated, at 13:07. Valve 4-867 is required to be locked open and back-seated when the reactor coolant system (RCS) temperature is greater than 380 degrees F, per Technical Specification 3.5.2. Unit 4 was in Technical Specification 3.0.3 (no OPERABLE cold leg injection flowpath for all HHSI pumps to Unit 4) for 30 minutes from time of discovery at 12:37 until correction at 13:07. Valve 4-867 was out of its required position for 5 hours and 26 minutes when the RCS was above 380 degrees F at 07:41 until it was correctly repositioned at 13:07.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
5.787037e-5 d (0.00139 hours, 8.267196e-6 weeks, 1.9025e-6 months)  +
00:00:00, 5 May 2008  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:14:29, 2 March 2018  +
17:03:00, 5 May 2008  +
false  +
false  +
0.0179 d (0.43 hours, 0.00256 weeks, 5.89014e-4 months)  +
16:37:00, 5 May 2008  +
TS-3.0.3 +  and TS-3.5.2 +
High Head Safety Injection Manual Valve to Cold Leg Found Mispositioned During Heatup  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
4  +