On 11/21/2007 at 1408 hours, the Clinton P … On 11/21/2007 at 1408 hours, the Clinton Power Station lost a portion of the Safety Parameter Display System in support of Process Computer replacement. These portions are not expected to be restored to service until Process Computer replacement activities are completed. The Plant Process Computer is expected to be fully operational by February 1, 2008.</br>This event is reportable due to the major loss of emergency assessment capability per 10CFR50.72 (b)(3)(xiii) (when the SPDS has been unavailable for 8 hours or greater).</br>The NRC Resident Inspector has been notified.</br>The alarm for secondary containment sump level has been lost to the SPDS. Compensatory measures are in effect.</br>* * * UPDATE ON 3/14/08 AT 1526 EDT FROM KISS TO HUFFMAN * * * </br>The system upgrade has been completed along with full confidence run testing. The SPDS is now considered operational and emergency assessment capability restored.</br>The licensee notified the NRC Resident Inspector and State authorities. </br>R3DO (Ring) was notified. authorities.
R3DO (Ring) was notified. +
20:08:00, 21 November 2007 +
43,802 +
18:55:00, 21 November 2007 +
20:08:00, 21 November 2007 +
On 11/21/2007 at 1408 hours, the Clinton P … On 11/21/2007 at 1408 hours, the Clinton Power Station lost a portion of the Safety Parameter Display System in support of Process Computer replacement. These portions are not expected to be restored to service until Process Computer replacement activities are completed. The Plant Process Computer is expected to be fully operational by February 1, 2008.</br>This event is reportable due to the major loss of emergency assessment capability per 10CFR50.72 (b)(3)(xiii) (when the SPDS has been unavailable for 8 hours or greater).</br>The NRC Resident Inspector has been notified.</br>The alarm for secondary containment sump level has been lost to the SPDS. Compensatory measures are in effect.</br>* * * UPDATE ON 3/14/08 AT 1526 EDT FROM KISS TO HUFFMAN * * * </br>The system upgrade has been completed along with full confidence run testing. The SPDS is now considered operational and emergency assessment capability restored.</br>The licensee notified the NRC Resident Inspector and State authorities. </br>R3DO (Ring) was notified. authorities.
R3DO (Ring) was notified. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
96 +
00:00:00, 14 March 2008 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:35:01, 24 September 2017 +
18:55:00, 21 November 2007 +
true +
false +
-0.0508 d (-1.22 hours, -0.00726 weeks, -0.00167 months) +
20:08:00, 21 November 2007 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.