Browse wiki
Jump to navigation
Jump to search
Unit 2 reactor scrammed due to a main turb … Unit 2 reactor scrammed due to a main turbine trip. PCIS (Primary Containment Isolation Signal) groups 2, 3,and 6 isolated, CREV (Control Room Emergency Ventilation) A, SBGT (Standby Gas Treatment) trains A, B, and C started as expected. All control rods fully inserted, eight main steam relief valves lifted and no ECCS actuations occurred. This event is reportable within four hours according to 10CFR50.72(b)(2)(iv)(B) and eight hours according to 10CFR50.72(b)(3)(iv)(A).</br>The turbine trip was the result of the 500kV main output breaker opening causing the generator output breaker to open. All relief valves fully seated during the scram recovery. The reactor water level is being maintained using normal feedwater and decay heat is being removed using the steam dumps. The plant is using the startup transformer for electrical power. </br>The cause of the 500kV breaker opening is under investigation.</br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector. +
14:16:00, 11 January 2007 +
43,092 +
13:16:00, 11 January 2007 +
14:16:00, 11 January 2007 +
Unit 2 reactor scrammed due to a main turb … Unit 2 reactor scrammed due to a main turbine trip. PCIS (Primary Containment Isolation Signal) groups 2, 3,and 6 isolated, CREV (Control Room Emergency Ventilation) A, SBGT (Standby Gas Treatment) trains A, B, and C started as expected. All control rods fully inserted, eight main steam relief valves lifted and no ECCS actuations occurred. This event is reportable within four hours according to 10CFR50.72(b)(2)(iv)(B) and eight hours according to 10CFR50.72(b)(3)(iv)(A).</br>The turbine trip was the result of the 500kV main output breaker opening causing the generator output breaker to open. All relief valves fully seated during the scram recovery. The reactor water level is being maintained using normal feedwater and decay heat is being removed using the steam dumps. The plant is using the startup transformer for electrical power. </br>The cause of the 500kV breaker opening is under investigation.</br>The licensee will notify the NRC Resident Inspector.ee will notify the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 11 January 2007 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:37:28, 24 September 2017 +
13:16:00, 11 January 2007 +
true +
-0.0417 d (-1 hours, -0.00595 weeks, -0.00137 months) +
14:16:00, 11 January 2007 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.