Browse wiki
Jump to navigation
Jump to search
On November 27, 2006 Fort Calhoun Station … On November 27, 2006 Fort Calhoun Station was on shutdown cooling, while in the process of moving the plant from Mode 3 to Mode 4 to fix a leak on an In-Core Instrument (ICI) Grayloc fitting. At 1327 Reactor Coolant Pump RC-3B was secured. At 1330, the last Reactor Coolant Pump (RC-3A) was secured. Once the reactor coolant pumps were secured, spray to the pressurizer was lost. This loss of pressurizer spray caused pressure in the pressurizer to rise; the systems pressure interlock caused HCV-347, Shutdown Cooling Loop 2 Outboard Isolation Valve, and HCV-348, Loop 2 to Shutdown Cooling Isolation Valve to close due to pressurizer pressure being greater than 250 psia.</br>At 1330 the Control Room entered AOP-19 for a Loss of Shutdown Cooling. The control room operators initiated auxiliary spray, lowered pressure, reopened HCV-347/348, and started Low Pressure Safety Injection Pump SI-1A. At 1342 shutdown cooling was reestablished. At 1352 all conditions to exit AOP-19 were met and the procedure was exited. During the 12 minutes that shutdown cooling was lost the highest pressure reached in the RCS was 254 psia up from 233 psi and the highest temperature was 135 degrees, up from 134 degrees as read on the core exit thermocouples.</br>The licensee informed the NRC Resident Inspector.ensee informed the NRC Resident Inspector. +
19:30:00, 27 November 2006 +
43,013 +
16:47:00, 27 November 2006 +
19:30:00, 27 November 2006 +
On November 27, 2006 Fort Calhoun Station … On November 27, 2006 Fort Calhoun Station was on shutdown cooling, while in the process of moving the plant from Mode 3 to Mode 4 to fix a leak on an In-Core Instrument (ICI) Grayloc fitting. At 1327 Reactor Coolant Pump RC-3B was secured. At 1330, the last Reactor Coolant Pump (RC-3A) was secured. Once the reactor coolant pumps were secured, spray to the pressurizer was lost. This loss of pressurizer spray caused pressure in the pressurizer to rise; the systems pressure interlock caused HCV-347, Shutdown Cooling Loop 2 Outboard Isolation Valve, and HCV-348, Loop 2 to Shutdown Cooling Isolation Valve to close due to pressurizer pressure being greater than 250 psia.</br>At 1330 the Control Room entered AOP-19 for a Loss of Shutdown Cooling. The control room operators initiated auxiliary spray, lowered pressure, reopened HCV-347/348, and started Low Pressure Safety Injection Pump SI-1A. At 1342 shutdown cooling was reestablished. At 1352 all conditions to exit AOP-19 were met and the procedure was exited. During the 12 minutes that shutdown cooling was lost the highest pressure reached in the RCS was 254 psia up from 233 psi and the highest temperature was 135 degrees, up from 134 degrees as read on the core exit thermocouples.</br>The licensee informed the NRC Resident Inspector.ensee informed the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 27 November 2006 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:17:36, 2 March 2018 +
16:47:00, 27 November 2006 +
false +
false +
-0.113 d (-2.72 hours, -0.0162 weeks, -0.00373 months) +
19:30:00, 27 November 2006 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.