Emergency plan unusual event entered due tEmergency plan unusual event entered due to a seismic event (LU-1). No equipment damage has been identified.</br>The seismic event occurred at 1611hrs and tremors were felt in the Control Room. Unit 1 remained at full power and initial plant walkdown identified no safety equipment damage. Plant instrumentation indicated an acceleration of 0.005 Gs. Per U.S. Geological Survey website the quake was a 3.4 on the Richter scale and occurred NNW of the site. There is a small likelihood of after shocks. No radioactive releases have occurred.</br>* * * UPDATE ON 06/20/06 AT 2019 EDT FROM JEFFREY D. ANDERSON TO M. RIPLEY * * *</br>Perry Plant has completed walkdowns from the Seismic Event that occurred at 1611. No Plant problems identified from walkdowns. Unusual Event has been terminated at 2000 on 6/20/06.</br>The licensee notified the NRC Resident Inspector, State and local officials.</br>Notified NRR (M. Case), IRD (Wilson), R3DO (O'Brien), DHS (Fite) and FEMA (Casto).DO (O'Brien), DHS (Fite) and FEMA (Casto).  +
20:30:00, 20 June 2006  +
16:54:00, 20 June 2006  +
20:30:00, 20 June 2006  +
Emergency plan unusual event entered due tEmergency plan unusual event entered due to a seismic event (LU-1). No equipment damage has been identified.</br>The seismic event occurred at 1611hrs and tremors were felt in the Control Room. Unit 1 remained at full power and initial plant walkdown identified no safety equipment damage. Plant instrumentation indicated an acceleration of 0.005 Gs. Per U.S. Geological Survey website the quake was a 3.4 on the Richter scale and occurred NNW of the site. There is a small likelihood of after shocks. No radioactive releases have occurred.</br>* * * UPDATE ON 06/20/06 AT 2019 EDT FROM JEFFREY D. ANDERSON TO M. RIPLEY * * *</br>Perry Plant has completed walkdowns from the Seismic Event that occurred at 1611. No Plant problems identified from walkdowns. Unusual Event has been terminated at 2000 on 6/20/06.</br>The licensee notified the NRC Resident Inspector, State and local officials.</br>Notified NRR (M. Case), IRD (Wilson), R3DO (O'Brien), DHS (Fite) and FEMA (Casto).DO (O'Brien), DHS (Fite) and FEMA (Casto).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 20 June 2006  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:18:33, 2 March 2018  +
16:54:00, 20 June 2006  +
false  +
-0.15 d (-3.6 hours, -0.0214 weeks, -0.00493 months)  +
20:30:00, 20 June 2006  +
Unusual Event Declared Due to a Seismic Event  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.