The following 60-day report is being made The following 60-day report is being made under 50.73 (a)(2)(iv)(A) for an invalid actuation of Division 1 containment isolation valves that occurred at 2259 hours on February 7, 2006. As allowed by 10CFR50.73(a)(1) this notification is being made via telephone. NUREG-1022, Revision 2 identifies the information that needs to be reported as follows:</br>(a) The specific train(s) and system(s) that were actuated.</br>An unexpected actuation of Division 1 containment isolation relays occurred during performance of WO 416930-02, EM - Agastat Relay Luayvg514b Replacement in panel 1H13P861. Momentary, inadvertent contact occurred between the top row R1-M1 pins of the Agastat relay being inserted and the second row T1-B1 contacts of the installed relay base while the Electrical Technician was attempting to align the relay for seating, prior to applying full seating force to the relay. The relay actuations resulted in closure of Division 1 isolation valves in the Fuel Pool Cooling and Cleanup, Suppression Pool Cooling and Cleanup, Component Cooling Water, Service Air, Containment and Drywell Equipment and Floor Drains, and Makeup Condensate systems.</br>(b) Whether each train actuation was complete or partial.</br>The actuations were complete for the portions that were enabled while relay testing was in progress.</br>(c) Whether or not the system started and functioned successfully.</br>There no system starts associated with this event</br>The NRC Resident Inspector was notified of this notification.spector was notified of this notification.  +
03:59:00, 8 February 2006  +
42,477  +
16:07:00, 5 April 2006  +
03:59:00, 8 February 2006  +
The following 60-day report is being made The following 60-day report is being made under 50.73 (a)(2)(iv)(A) for an invalid actuation of Division 1 containment isolation valves that occurred at 2259 hours on February 7, 2006. As allowed by 10CFR50.73(a)(1) this notification is being made via telephone. NUREG-1022, Revision 2 identifies the information that needs to be reported as follows:</br>(a) The specific train(s) and system(s) that were actuated.</br>An unexpected actuation of Division 1 containment isolation relays occurred during performance of WO 416930-02, EM - Agastat Relay Luayvg514b Replacement in panel 1H13P861. Momentary, inadvertent contact occurred between the top row R1-M1 pins of the Agastat relay being inserted and the second row T1-B1 contacts of the installed relay base while the Electrical Technician was attempting to align the relay for seating, prior to applying full seating force to the relay. The relay actuations resulted in closure of Division 1 isolation valves in the Fuel Pool Cooling and Cleanup, Suppression Pool Cooling and Cleanup, Component Cooling Water, Service Air, Containment and Drywell Equipment and Floor Drains, and Makeup Condensate systems.</br>(b) Whether each train actuation was complete or partial.</br>The actuations were complete for the portions that were enabled while relay testing was in progress.</br>(c) Whether or not the system started and functioned successfully.</br>There no system starts associated with this event</br>The NRC Resident Inspector was notified of this notification.spector was notified of this notification.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0261 d (0.628 hours, 0.00374 weeks, 8.595495e-4 months)  +
00:00:00, 5 April 2006  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:39:03, 24 September 2017  +
16:07:00, 5 April 2006  +
false  +
false  +
56.547 d (1,357.13 hours, 8.078 weeks, 1.859 months)  +
03:59:00, 8 February 2006  +
Invalid System Actuations  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +