Browse wiki
Jump to navigation
Jump to search
On 11/25/05 at approximately 2120 hours, a … On 11/25/05 at approximately 2120 hours, an oil spill occurred on plant site. During normal shift rounds, Power Operations observed oil coming from the overflow of an oil storage tank associated with the X-530 345KV under ground oil pumping station. A pump failed to shut off as required, allowing oil to be pumped to the storage tank until operator intervention shut down the pump.</br>At 0020, 11/26/2005 hours, The Plant Shift Superintendent notified the National Response Center and the Ohio EPA that a Reportable Quantity (RQ) of insulating oil (Polybutene) was released to the ground. No material left the immediate area and clean-up of the spill is currently in progress. </br>UE2-RA-RE1030, Appendix D, section P requires a 4 hour NRC event when other government agencies are notified.</br>The licensee reported this event to the National Response Center as report number 780580. The licensee notified NRC Region 2 (Hartland).licensee notified NRC Region 2 (Hartland). +
02:20:00, 26 November 2005 +
42,170 +
04:09:00, 26 November 2005 +
02:20:00, 26 November 2005 +
On 11/25/05 at approximately 2120 hours, a … On 11/25/05 at approximately 2120 hours, an oil spill occurred on plant site. During normal shift rounds, Power Operations observed oil coming from the overflow of an oil storage tank associated with the X-530 345KV under ground oil pumping station. A pump failed to shut off as required, allowing oil to be pumped to the storage tank until operator intervention shut down the pump.</br>At 0020, 11/26/2005 hours, The Plant Shift Superintendent notified the National Response Center and the Ohio EPA that a Reportable Quantity (RQ) of insulating oil (Polybutene) was released to the ground. No material left the immediate area and clean-up of the spill is currently in progress. </br>UE2-RA-RE1030, Appendix D, section P requires a 4 hour NRC event when other government agencies are notified.</br>The licensee reported this event to the National Response Center as report number 780580. The licensee notified NRC Region 2 (Hartland).licensee notified NRC Region 2 (Hartland). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 26 November 2005 +
GDP-2 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:36:38, 24 November 2018 +
04:09:00, 26 November 2005 +
0.0758 d (1.82 hours, 0.0108 weeks, 0.00249 months) +
02:20:00, 26 November 2005 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.