Browse wiki

Jump to navigation Jump to search
The inspectors identified a finding of verThe inspectors identified a finding of very low safety significance (Green) and an associated NCV of TS 5.4.1.a, Procedures, associated with the licensees failure to properly implement Procedure FPWMMMP01, Minor Maintenance Process, Revision 5, while planning and performing maintenance on a steam exclusion barriertransom latch assembly. Specifically, on February 3, 2017, maintenance workers in coordination with the Fix-It-Now (FIN) Senior Reactor Operator (SRO) removed the lower latch assembly from a transom above Door 225 that rendered the steam exclusion barrier non-functional. Consequently, for an approximately five minute window during maintenance on the latch assembly, the 11 safeguards battery system was rendered inoperable with respect to a postulated turbine building High Energy Line Break (HELB) event. The licensee entered the issues into the Corrective Action Program (CAP) as CAPs 1548470 and 1549724.The inspectors determined that the licensees failure to properly implement procedure FPWMMMP01 as required by Technical Specification (TS) 5.4.1.a. was aperformance deficiency. The performance deficiency was determined to be more than minor and a finding in accordance with IMC 0612, Appendix B, Issue Screening, because it was associated with the Mitigating Systems Cornerstone attribute of Human Performance and affected the associated cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors applied IMC 0609, Attachment 4, Initial Characterization of Findings, to this finding. Since the inspectors answered No to all questions within IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding screened as very low safety significance (Green). The inspectors determined that the performance characteristic of the finding that was the most significant causal factor of the performance deficiency was associated with the cross-cutting aspect of Teamwork in the Human Performance cross-cutting area, and involved individuals and work groups not properly communicating and coordinating their activities within and across organizational boundaries to ensure nuclear safety was maintained. (H.4)sure nuclear safety was maintained. (H.4)  
23:59:59, 30 June 2017  +
05000282  +
23:59:59, 30 June 2017  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
19:06:05, 30 September 2017  +
23:59:59, 30 June 2017  +
Failure to Properly Implement the Minor Maintenance Process During Door 225 Transom Maintenance  +