Semantic search

Jump to navigation Jump to search
 Issue dateTitle
PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes7 October 2021Report of Changes, Tests and Experiments, and Summary of Commitment Changes
IR 05000255/202100210 August 2021Integrated Inspection Report 05000255/2021002
IR 05000255/202100112 May 2021Integrated Inspection Report 05000255/2021001
ML20267A3596 July 20202020 Palisades Ile Proposed Written Exam with Answer Key - Redacted
ML20268A1506 July 20202020 Palisades Ile Administered Written Exam with Answer Key - Redacted
IR 05000255/202000112 May 2020Integrated Inspection Report 05000255/2020001
ML18114A4104 June 2018Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266)
PNP 2017-035, License Amendment Request - Administrative Controls for a Permanently Defueled Condition27 July 2017License Amendment Request - Administrative Controls for a Permanently Defueled Condition
IR 05000255/20140053 February 2015IR 05000255/2014005; 07200007/2014001; on 10/01/2014 - 12/31/2014; Palisades Nuclear Plant; Problem Identification and Resolution
ML15117A28619 January 20152015 Palisades Nuclear Plant Initial License Retake Examination Proposed Exam Files
IR 05000255/20140027 May 2014IR 05000255-14-002, on 01/01/2014 - 03/31/2014; Palisades Nuclear Plant; Equipment Alignment; Inservice Inspection Activities; Refueling and Other Outage Activities; Radiological Hazard Assessment and Exposure Controls
IR 05000255/201300512 February 2014IR 05000255-13-005, 10/01/2013 - 12/31/2013; Palisades Nuclear Plant; Fire Protection; Radiological Hazard Assessment and Exposure Controls; Identification and Resolution of Problems
IR 05000255/201300214 May 2013IR 05000255-13-002; 01/01/2013 - 03/31/2013; Palisades Nuclear Plant; Heat Sink Performance; Plant Modifications; Surveillance Testing; Occupational Dose Assessment; Problem Identification and Resolution
IR 05000255/201200511 February 2013Inspection Report 05000255-12-005; 10/01/2012 12/31/2012; Palisades Nuclear Plant; Operability Determinations and Functional Assessments; Identification and Resolution of Problems
IR 05000255/201200413 November 2012IR 05000255-12-004, 07/01/12 - 9/30/12, Palisades Nuclear Plant, Maintenance Risk Assessments and Emergent Work Control; Operability Determinations and Functional Assessments
IR 05000255/201201217 October 2012IR 05000255-12-012, 08/15/2012 - 09/05/2012, Palisades Nuclear Plant, Inspection Procedure 93812, Special Inspection
IR 05000255/20110052 February 2012IR 05000255-11-005; 07200007-11-001, on 10/01/2011 - 12/31/2011; Palisades Nuclear Plant; Identification and Resolution of Problems
ML12023A18717 January 2012EA-PSA-SDP-D11-2-11-07, Rev. 2, SDP Assessment of DC Panel D11-2 Fault, Cover Through Appendix a
ML12006A0715 January 2012SDP Assessment of DC Panel D-11-2 Fault Palisades
IR 05000255/20110048 November 2011IR 05000255-11-004, on 07/01/2011 - 09/30/2011; Palisades Nuclear Plant; Radiological Hazard Assessment and Exposure Controls, Other Activities
IR 05000255/200601324 January 2007IR 05000255-06-013; 10/01/2006 - 12/31/2006; Palisades Nuclear Plant; Surveillance Testing, as Low as Is Reasonably Achievable Planning and Controls, and Other Activities
ML07011005310 January 2007Facility Operating License DPR-20, Appendix a (Technical Specifications)
ML05241021322 August 2005Report of Changes to Technical Specifications Bases
ML05193022014 July 2005NPP 2005 Ro/Sro Initial Written Examination
ML04334019522 October 2004Revisions to Palisades Nuclear Plant Emergency Action Levels
ML18066A64717 September 1999Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs
ML18066A65017 September 1999Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8
ML18066A59730 July 1999Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments
ML20154N29012 October 1998Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs
ML18054A60923 March 1989LER 86-017-01:on 860410,unidentified Primary Coolant Sys Leakage Calculated to Be in Excess of Tech Spec Limit.Caused by Relief Valve Not Fully Reseated & Reactor Head Vent Sys Valves Not Fully Seated.Valve repaired.W/890323 Ltr
IR 05000255/19860087 April 1986Insp Rept 50-255/86-08 on 860115-0314.Violation Noted: Inadequate Review of & Corrective Action for Containment Isolation Valve Leakage Event Noted in May & Aug 1985
IR 05000255/198502718 December 1985Insp Rept 50-255/85-27 on 851016-1118.Violations Noted: Environmentally Qualified Temp Switch for Safeguards Pump Room Not Installed & Verification of Firewater Sys Valve Operability & Positioning Delayed
IR 05000255/198502124 October 1985Insp Rept 50-255/85-21 on 850813-0910.No Noncompliance Noted.Major Areas Inspected:Maint,Operational Safety, Surveillance,Esf Walkdown,Lers & Confirmatory Action Ltr