 Issue dateTitle
ML21106A0177 April 2021Enclosure a - Evaluation Attachment 3 - Proposed Updated Final Safety Analysis Report Text Pages
ML21106A0187 April 2021Enclosure a - Evaluation Attachment 1 - Proposed Updated Final Safety Analysis Report Text Pages
ML21106A0207 April 2021Enclosure a - Evaluation of Proposed Change
L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change6 December 2013Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change
ML20236R37910 July 1998Audit Rept,Commitment Mgt Centerior Svc Co for Perry Nuclear Plant,Unit 1
ML20203G24511 December 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-440/97-08.Actions Will Be Examined During Future Insp
PY-CEI-NRR-2228, Responds to NRC Re Violations Noted in Insp Rept 50-440/97-08.Corrective Actions:Engineering Improvement Plan Will Incorporate Lessons Learned from Collective Significance Review.Plan Will Be Finalized by End of 199724 November 1997Responds to NRC Re Violations Noted in Insp Rept 50-440/97-08.Corrective Actions:Engineering Improvement Plan Will Incorporate Lessons Learned from Collective Significance Review.Plan Will Be Finalized by End of 1997
IR 05000440/199700724 October 1997Insp Rept 50-440/97-07 on 970503-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support
ML20216G76123 October 1997Safety Evaluation Summary,Per 10CFR50.59(B)(2)
PY-CEI-NRR-2224, Discusses Tornado Missile Protection at Plant.Procedural Control Change Considered to Be Regulatory Commitment1 October 1997Discusses Tornado Missile Protection at Plant.Procedural Control Change Considered to Be Regulatory Commitment
PY-CEI-NRR-2221, Forwards Addl Info Re tornado-generated Missiles to Suppl Info Contained in Submittal Dtd 970814.Addl Info Is Provided to Aid NRC in Review of Issue26 September 1997Forwards Addl Info Re tornado-generated Missiles to Suppl Info Contained in Submittal Dtd 970814.Addl Info Is Provided to Aid NRC in Review of Issue
ML20198L52423 September 1997Insp Rept 50-440/97-08 on 970721-0827.Violations Noted. Major Areas Inspected:Unresolved Items & Insp follow-up Items Identified by Design Insp Conducted from 970127-0327
PY-CEI-NRR-2200, Requests Change to Unit 1 Design Basis as Described in USAR, Per 10CFR50.59 & 10CFR50.90,NRC Review & Approval.Change Will Add Description of Methodology Utilized for Determining Sys14 August 1997Requests Change to Unit 1 Design Basis as Described in USAR, Per 10CFR50.59 & 10CFR50.90,NRC Review & Approval.Change Will Add Description of Methodology Utilized for Determining Sys
PY-CEI-NRR-2180, Submits Sys Leakage Associated W/Emergency Closed Cooling Sys & Adequacy of Plant Tornado Missile Protection. Corrective Action Program Will Be Used to Determine Root Cause & Extent of Condition,Per 970605 Plant Shutdown13 June 1997Submits Sys Leakage Associated W/Emergency Closed Cooling Sys & Adequacy of Plant Tornado Missile Protection. Corrective Action Program Will Be Used to Determine Root Cause & Extent of Condition,Per 970605 Plant Shutdown
ML20140F79110 June 1997Forwards Insp Rept 50-440/97-201 on 970217-0327.Identified Three Examples Where Facility Being Operated Differently than Described in USAR or Vendor Design Input Info
ML20140F83710 June 1997Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys
IR 05000440/199720110 June 1997Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML20041B17116 February 1982Forwards Response to Structural Engineering Branch Request for Addl Info Per 811201-04 Meeting.Use of Elastic Linear Stress Distributions in Analysis of Reactor Bldg Mat Justified