 Issue dateTitle
ML21104A36625 September 20203 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems (Redacted)
ML18114A1673 May 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to RIS 2015-06, Tornado Missile Protection:
IR 05000346/201800130 April 2018Integrated Inspection Report 05000346/2018001 and Exercise of Enforcement Discretion
L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....12 April 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....
IR 05000346/201700314 November 2017NRC Integrated Inspection Report 05000346/2017003; 07200014/2017001; and 07200014/2017002
05000346/LER-2017-00118 September 2017Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles
LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles
ML17120A00121 November 2016Revision 31 to Updated Final Safety Analysis Report, Section 9 (Redacted)
ML16104A35030 April 2016NUREG-2193, Suppl 1, Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station. Docket Number 50-346, Firstenergy Nuclear Operating Company.
ML15196A42910 August 2015Supplemental Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station,
ML15205A1697 August 2015ACRS Review of the Davis Besse Nuclear Plant LRA - Transmittal of the Sser
L-14-114, Reply to Request for Additional Information for the Review of License Renewal Application (TAC No. ME4640) and Amendment No. 4911 March 2014Reply to Request for Additional Information for the Review of License Renewal Application (TAC No. ME4640) and Amendment No. 49
ML12200A21221 November 2011Containment Shield Building Issue
ML12213A35315 November 2011Shield Building Laminar Cracking
ML12213A35110 November 2011Containment Shield Building Issue
ML12213A33931 October 2011Addendum to the Reactor Vessel Head Replacement Communication Plan
ML12200A18618 October 2011Email from S. Cuardadodejesus, NRR to R. Auluck, NRR Et Al. on Davis-Besse Shield Building Issue Summary
L-11-166, Reply to Request for Additional Information for the Review of the License Renewal Application, Batch 3 (TAC No. ME4640), and License Renewal Application Amendment No. 83 June 2011Reply to Request for Additional Information for the Review of the License Renewal Application, Batch 3 (TAC No. ME4640), and License Renewal Application Amendment No. 8
IR 05000346/200900719 February 2010IR 05000346-09-007; 11/03/2009 - 01/14/2010; Davis-Besse Nuclear Power Station; Component Design Bases Inspection
ML07031031226 January 2007Withdrawal of License Amendment Application to Change Design Requirements for Tornado Missile Protection
ML06262044523 October 2006Draft Request for Additional Information Regarding Diesel Requirements for Tornado Missile Protection
ML06108012625 May 2006Request for Additional Information Related to Tornado Missile Protection
ML05014027611 January 2005License Amendment Application to Change Design Requirements for Tornado Missile Protection (License Amendment Request No. 04-0024)
IR 05000346/20040103 August 2004IR 05000346-04-010(DRS) on 6/28/2004 - 7/2/2004 for Davis-Besse Nuclear Power Station; Evaluations of Changes, Experiments or Tests, and Permanent Plant Modifications
ML0406800705 March 2004IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness
ML03336025123 November 2003Integrated Report to Support Restart of the Davis-Besse Nuclear Power Station and Request for Restart Approval
ML03343040920 November 2003Supplemental Information Related to NRC Request for Information Regarding the Adequacy and Availability of Design Basis Information
ML0301507329 January 2003Firstenergy Nuclear Operating Company (Fenoc), Revision 5 of Davis-Besse Unit 1, Return to Service Plan & Ten Other Associated Restart Plans
ML02303054829 October 2002Minutes of Internal Meeting of the Davis-Besse Oversight Panel
ML14112A00529 October 2002Exhibit 5 - Minutes of Internal Meeting of Davis-Besse Oversight Panel, October 29, 2002
ML02268026517 September 2002Return to Service Update
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML20083Q40713 April 1984Responds to 840326 Request for Addl Info Re Tornado Missile Protection for Chlorine Detectors.Missiles Considered for Tornado Analysis Described in Table 3.5-2 of Fsar/Usar & Reviewed in Section 3.5.2 of SER (NUREG-0136)
ML20023C59529 April 1983Discusses Results of Analysis Performed to Determine Probability of Postulated Tornado Generated Missile Contacting Gratings Covering Ventilation Openings. Probability Acceptably Small.Condition Not RO
ML20003D58819 March 1981Responds to 810220 Ltr Re Submittal of Plans,Schedules & Design Descriptions of 10CFR 50,App R,Mod for Fire Protection.Forwards Design Description of Alternate Svc Water Capability
ML19329B18117 December 1975Responds to NRC 751114 Ltr.Forwards Info Re Tornado Missile Protection