Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20311A6096 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A5826 November 20172017 Q1-Q4 ROP Inspection Findings
IR 05000445/20170019 May 2017NRC Integrated Inspection Report 05000445/2017001 and 05000446/2017001
ML15320A10013 November 2015IR 05000445/2015008 and 05000446/2015008, on 08/31/2015 - 10/01/2015, Comanche Peak Nuclear Power Plant, NRC Problem Identification and Resolution and Notice of Violation
IR 05000445/20150072 September 2015IR 05000445/2015007 and 05000446/2015007), June 1, 2015 Through August 3, 2015, Comanche Peak, Units 1 and 2, NRC Component Design Bases
IR 05000445/201200324 July 2012IR 05000445-12-003, 05000446-12-003, 03/28/2012 - 06/26/2012, Comanche Peak Nuclear Power Plant, Units 1 and 2, Operability Evaluations, Surveillance Testing, Identification and Resolution of Problems
ML20199J5141 February 1997CPSES 10CFR50.59 Evaluation Summary Rept 0007,for 960202- 970801
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
IR 05000445/199300610 February 1993Insp Repts 50-445/93-06 & 50-446/93-06 on 930113-22.No Violations Noted.Major Areas Inspected:Hardware,Controls for Anticipated Transient W/O Scram Mitigation Sys & Moderator Boron Dilution Control Sys
TXX-9223, Forwards line-by-line Descriptions of Changes in Amend 85 to FSAR29 May 1992Forwards line-by-line Descriptions of Changes in Amend 85 to FSAR
ML20149D7485 February 1988Final Deficiency Rept CP-88-22 Re Svc Water Discharge Pipe Missile Protection.Initially Reported on 880128.Design Basis Document DBD-CS-081, General Structural Design Criteria, Established to Incorporate Tornado Missile Barrier Criteria
ML19261A61231 January 1979Forwards Initial Responses to Auxiliary Systems Branch Questions (Q005.1-Q005.3,Q010.2,Q010.4-Q010.19) Re Component Code & Seismic Classification.Responses Will Be Retransmitted to NRC in FSAR Amend 4