Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000334/202200310 November 2022Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001
ML22144A13618 May 20226 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML21334A03522 November 20213 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection
L-20-186, 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection23 November 20205 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML18094A53612 April 2018Enforcement Discretion Per Egm 15-002
L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.15 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.
IR 05000334/201700424 January 2018Integrated Inspection Report 05000334 2017004 and 05000412 2017004 and Independent Spent Fuel Storage Installation Report 07201043/2017001
IR 05000334/201700326 October 2017Integrated Inspection Report 05000334/2017003 and 05000412/2017003
05000334/LER-2017-00213 September 20171 OF 4
LER 17-002-00 for Beaver Valley Power Station, Unit No. 1 Regarding Inadequate Emergency Diesel Generator (EOG) Tornado Missile Protection Identified Due to Non-conforming Design Conditions
IR 05000334/20170021 August 2017Integrated Inspection Report 05000334/2017002 and 05000412/2017002
IR 05000334/201700115 May 2017Integrated Inspection Report 05000334/2017001 and 05000412/2017001 and Exercise of Enforcement Discretion
05000412/LER-2017-0012 May 2017Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category 1 Piping to Not Seismic Category 1 Piping
LER 17-001-00 For Beaver Valley Power Station, Unit No. 2 Re: Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category l Piping to Not Seismic Category 1 Piping
ML17244A91221 April 2017Redacted - Beaver Valley Power Station, Unit 1, Revision 30 to Updated Final Safety Analysis Report, Section 2, Site
05000334/LER-2017-00118 April 2017Inadequate Tornado Missile Protection Identified Due to Non-Conforming Design Conditions
LER 17-001-00 for Beaver Valley Power Station, Unit Nos. 1 and 2 Regarding Inadequate Tornado Missile Protection Identified Due to Nonconforming Design Conditions
ML14339A43024 November 2014Updated Final Safety Analysis Report, Revision 21, Section 12, Radiation Protection
ML09302027631 October 2009NUREG-1929, Vol. 1, (1:2) Cover Through Chpt. 2, Safety Evaluation Report, Related to the License Renewal of Beaver Valley Power Station, Units 1 and 2, Firstenergy Nuclear Operating Company
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML17352A86931 May 1993Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants.
ML20132C47930 October 1984Forwards Auxiliary Sys Branch SER Input Re All FSAR Amends Up to & Including Amend 8.Areas Listed Unresolved & Require Addl Info.Resolution of Listed Concerns Will Be Reported in Sser.Salp Evaluation Also Encl
ML20132C34427 July 1984Forwards SER on SRP Sections Re Electrical & Mechanical Items.Mechanical Open Items List & Electrical Issue Status List Encl.Salp Input Also Encl