ML22313A1592 December 2022Regulatory Audit Summary Related to the License Amendment Request Turbine Building Wind Loading Basis Change
ML22339A1371 December 2022License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Supplemental Information
ML22255A1863 October 2022Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan
ML22104A12514 April 2022License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure
IR 05000280/20200105 November 2020NRC Design Bases Assurance Inspection Report 05000280/2020010 and 05000281/2020010
IR 05000280/202000210 August 2020Integrated Inspection Report 05000280/2020002 and 05000281/2020002 and Exercise of Enforcement Discretion
05000280/LER-2019-0024 February 2020LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile Protection
ML20311A3646 November 20172017 Q1-Q4 ROP Inspection Findings
ML16146A54018 May 2016Proposed License Amendment Request Extension of TS 3.14 Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements
ML16033A35325 January 2016Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)
ML15209A50322 July 2015Compliance Letter in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML15205A34220 July 2015Confirmation of Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML15069A2342 March 2015Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML14069A01527 February 2014Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
IR 05000280/201300510 February 2014IR 05000280-13-005, 05000281-13-005; 10/01/2013 - 12/31/2013; Surry Power Station, Units 1 and 2: Plant Modifications; Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
ML13063A18128 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML10090039130 March 2010Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)
IR 05000280/200900429 October 2009IR 05000280-09-004 and 05000281-09-004; 07/01/2009 - 09/30/2009; Surry Power Station, Units 1 and 2; Fire Protection, Operability Evaluations, Plant Modifications, Post Maintenance Testing, Identification and Resolution of Problems
ML07351168217 December 2007Proposed License Amendment Request, One-Time Five-Year Extension to Type a Test Interval
ML03258014010 September 2003Technical Specifications Pages for Amendments 236 & 235, Revising Technical Specifications to Add Provisions to Permit Inspection & Related Repair of Buried Fuel Oil Storage Tank During Plant Operation
ML18153A59115 February 1996LER 96-001-00:on 951213,ESW Pump Was Inoperable Due to Loss of Missile Protection for Piping.Revised DCP 91-025.W/960215 Ltr
ML18151A93510 February 1992Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl
ML20211H7466 June 1986Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted
IA-86-542, Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted6 June 1986Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted
ML18152A09524 April 1985Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept
ML18142A08226 October 1984Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to 840828 Ltr.Technical Basis & Clarification of Fixity Condition Used in Block Wall Analysis Provided
ML18141A09125 August 1983Proposed Tech Specs Removing Eight Snubbers from Table 4.17-1 & Adding Supervisor of Health Physics
ML18139B81722 March 1982Submits nine-month Response to NRC 801222 Ltr Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also Forwards Bechtel Nine-Month Response to NRC Ltr Dtd 801222 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.