Issue date | Title | |
---|---|---|
ML22313A159 | 2 December 2022 | Regulatory Audit Summary Related to the License Amendment Request Turbine Building Wind Loading Basis Change |
ML22339A137 | 1 December 2022 | License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure Supplemental Information |
ML22255A186 | 3 October 2022 | Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan |
ML22104A125 | 14 April 2022 | License Amendment Request for NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure |
IR 05000280/2020010 | 5 November 2020 | NRC Design Bases Assurance Inspection Report 05000280/2020010 and 05000281/2020010 |
IR 05000280/2020002 | 10 August 2020 | Integrated Inspection Report 05000280/2020002 and 05000281/2020002 and Exercise of Enforcement Discretion |
05000280/LER-2019-002 | 4 February 2020 | LER 2019-002-00 for Surry Power Station Unit 1, Items Non-Conforming to Design for Tornado Missile Protection |
ML20311A364 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML16146A540 | 18 May 2016 | Proposed License Amendment Request Extension of TS 3.14 Service Water Flow Path Allowed Outage Times and Deletion of Expired Temporary Service Water Jumper Requirements |
ML16033A353 | 25 January 2016 | Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) |
ML15209A503 | 22 July 2015 | Compliance Letter in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML15205A342 | 20 July 2015 | Confirmation of Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation |
ML15069A234 | 2 March 2015 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML14069A015 | 27 February 2014 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
IR 05000280/2013005 | 10 February 2014 | IR 05000280-13-005, 05000281-13-005; 10/01/2013 - 12/31/2013; Surry Power Station, Units 1 and 2: Plant Modifications; Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation |
ML13063A181 | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML100900391 | 30 March 2010 | Proposed License Amendment Request Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirement to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
IR 05000280/2009004 | 29 October 2009 | IR 05000280-09-004 and 05000281-09-004; 07/01/2009 - 09/30/2009; Surry Power Station, Units 1 and 2; Fire Protection, Operability Evaluations, Plant Modifications, Post Maintenance Testing, Identification and Resolution of Problems |
ML073511682 | 17 December 2007 | Proposed License Amendment Request, One-Time Five-Year Extension to Type a Test Interval |
ML032580140 | 10 September 2003 | Technical Specifications Pages for Amendments 236 & 235, Revising Technical Specifications to Add Provisions to Permit Inspection & Related Repair of Buried Fuel Oil Storage Tank During Plant Operation |
ML18153A591 | 15 February 1996 | LER 96-001-00:on 951213,ESW Pump Was Inoperable Due to Loss of Missile Protection for Piping.Revised DCP 91-025.W/960215 Ltr |
ML18151A935 | 10 February 1992 | Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl |
ML20211H746 | 6 June 1986 | Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted |
IA-86-542, Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted | 6 June 1986 | Requests Authorization to Issue Initial License for Dry Cask Storage of Spent Fuel Per 10CFR72 in Isfsi.License Should Be Granted |
ML18152A095 | 24 April 1985 | Masonry Wall Design,Surry Power Station Units 1 & 2, Technical Evaluation Rept |
ML18142A082 | 26 October 1984 | Forwards Addl Info Re IE Bulletin 80-11, Masonry Wall Design, in Response to 840828 Ltr.Technical Basis & Clarification of Fixity Condition Used in Block Wall Analysis Provided |
ML18141A091 | 25 August 1983 | Proposed Tech Specs Removing Eight Snubbers from Table 4.17-1 & Adding Supervisor of Health Physics |
ML18139B817 | 22 March 1982 | Submits nine-month Response to NRC 801222 Ltr Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also Forwards Bechtel Nine-Month Response to NRC Ltr Dtd 801222 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2. |
ML18139B623 | 23 November 1981 | Forwards Info in Form of Questionnaires in Response to 810724 Request Re Unresolved Safety Issue A-44, Station Blackout. |