Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
GO2-19-027, License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System | 25 February 2019 | License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System |
ML15355A496 | 21 December 2015 | Final Safety Analysis Report, Amendment 63, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, Table of Contents |
GO2-15-175, Response to Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions, Phases 1 and 2, Revision 1 | 16 December 2015 | Response to Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions, Phases 1 and 2, Revision 1 |
ML15076A122 | 15 April 2015 | Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink |
ML14335A158 | 25 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
GO2-14-107, Energy Northwest'S Phase 1 Response to NRC Order EA-13-109, Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions | 30 June 2014 | Energy Northwest'S Phase 1 Response to NRC Order EA-13-109, Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions |
ML13337A266 | 29 January 2014 | Interim Staff Evaluation and Audit Report Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14010A301 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 6 - Engineered Safety Features |
ML14010A295 | 30 December 2013 | Final Safety Analysis Report, Amendment 62, Chapter 3 - Design Criteria - Structures, Components, Equipment, and Systems, Table of Contents Through 3.5-46 |
ML13357A322 | 21 December 2013 | Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Columbia Generating Station, TAC No.: MF0796 |
GO2-12-026, License Renewal Application Third Annual Update | 16 February 2012 | License Renewal Application Third Annual Update |
ML12011A160 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML12011A154 | 14 December 2011 | Amendment 61 to Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment, and Systems |
GO2-11-192, Comments on Safety Evaluation Report for License Renewal Application | 12 December 2011 | Comments on Safety Evaluation Report for License Renewal Application |
ML061000672 | 14 April 2006 | License Amendment, Extends the Required Action Completion Times (CT) Specified in TS 3.8.1, AC Sources - Operating, to Restore an Inoperable DG to Operable Status from the Current 72 Hours to 14 Days |
IR 05000397/2002008 | 1 November 2002 | IR 05000397-02-008, 07200035-02-008, on 06/04/2002, 06/25-27/2002, 07/15-19/2002, 08/14-16/2002, 09/11-12/2002, 09/03-06/2002, & 09/13-20/2002, Columbia Generating Station |
ML17291B079 | 10 October 1995 | Requests Approval to Revise Tornado Design Criteria |
ML17290A890 | 6 January 1994 | Forwards Request for Approval to Revise WNP-2 Tornado Design Criteria Per Rg 1.76 Section C.1.2 |
ML17290A918 | 27 December 1993 | Justification for Revised Tornado Design Criteria,Rev 1. |
ML17289B155 | 9 February 1993 | Requests for Temporary Relief from Tornado Missile Design Criteria as It Relates to Protective Soil Cover Requirements Above Underground safety-related Diesel Oil Storage Tanks |
ML17277A476 | 23 February 1983 | Responds to NRC Question 010.068 Re Secondary Missile Generation Resulting from Spalling & Scabbing of Concrete Walls & Barriers Upon Impact by Credible Plant Missiles. Survey Indicates No Secondary Missiles Can Be Generated |
ML17277A414 | 7 January 1983 | Forwards Amend 27 to FSAR |
ML17276B599 | 12 August 1982 | Forwards marked-up FSAR Pages Submitting Addl Info Re Internally Generated Missiles (Outside Containment),Per 820528 Commitment.Info Closes Outstanding SER Issue 2, NUREG-0892 |
ML17276B559 | 23 July 1982 | Comments on NRC 820629 Response to 820514 Ltr Re Tornado Missile Protection for Diesel Generator Exhausts.Backfitting Would Not Justify Cost.Requests Item Be Deleted from SER Open Item List |
ML17276B469 | 28 May 1982 | Forwards Rewrite to FSAR Section 3.5, Missile Protection, Closing Out Part of Open Item 2 in NUREG-0892.Remainder of Open Item, Internally Generated Missiles (Outside Containment), Will Be Transmitted in June 1982 |
ML17276B448 | 14 May 1982 | Provides Justification for Adequacy of Present Design Re Tornado Missile Protection for Diesel Generator Exhausts. New SRP Requirement Should Not Be Imposed.Removal of Item from SER Outstanding Issue List Requested.Rept Encl |
ML17276B131 | 1 March 1982 | Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR |
ML20213E017 | 19 February 1982 | Forwards Safety Evaluation of FSAR Through Amend 20 |
ML17276B082 | 5 February 1982 | Forwards Amend 21 to Fsar.Affidavit Will Be Furnished within 10 Days of Filing to Reflect Distribution of Amend,Per 10CFR2.101 |
ML17276A971 | 14 January 1982 | Forwards Response to Draft SER Open Issues & Outstanding Open Branch Meeting Issues |
ML20213D920 | 18 November 1981 | Forwards Structural Engineering Branch Draft SER Input Based on Review of FSAR Section 3 |
ML20213D827 | 30 September 1981 | Forwards Requests for Addl Info to Complete Review of Structural Aspects of OL Application |
ML17275B247 | 31 May 1981 | Organization Charts,Including Depts of Nuclear Safety,Qa, WPPSS-2 Program,Power Generation,Technology,Administration & Health,Safety & Security |
ML17275B045 | 18 May 1981 | Forwards Amend 14 to FSAR |
ML17272A749 | 28 September 1979 | Results of Hardness Testing & Metallurgical Examination on Feedwater Pipe Welds at Washington Nuclear Project 2. |
ML17272A453 | 16 May 1979 | Forwards Util Responses to Round One,Set Three Questions from Auxiliary Sys Branch.Responses Will Be Incorporated Into FSAR |
ML17272A403 | 23 March 1979 | Forwards Amend 3 to FSAR |
ML20213C883 | 5 March 1979 | Comments Re Need for Addl Info Before Completion of First Round Review of Fsar.W/Encl First Request for Info Re Combined Effect of Loads Generated by Design Basis Tornado |
ML17272A202 | 30 November 1978 | Forwards Deficiency Repts Dtd 770818,770705,770818,770915, 771114,761105,761217,770224,780530,780526,771227,780410 & 781106(ANO 7811220197),copies of Which Had Not Been Forwarded to Director of I&E,But Were Sent to Region V |
ML20214G747 | 31 May 1977 | Requests Addl Info Re Missile Protection,Fuel Handling Sys, Fuel Handling HVAC Sys,Fire Protection Sys,Main Steam Sys & Circulating Water Sys,For Safety Review of FSAR |
ML20214G564 | 18 May 1972 | Forwards Hydrologic Engineering Questions on Plant Per 720512 Visit W/Ll Humphreys for Transmittal to Applicant |