GO2-82-265, Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR

From kanterella
(Redirected from ML17276B131)
Jump to navigation Jump to search
Forwards Addl Info Re Control Room Chillers & One Oversize Drawing of Diesel Generator Exhaust Line Configuration Showing Tornado Missile Protection,Per NRC 820219 Request. Aperture Card Is Available in PDR
ML17276B131
Person / Time
Site: Columbia 
Issue date: 03/01/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17276B132 List:
References
GO2-82-265, NUDOCS 8203090767
Download: ML17276B131 (8)


Text

REGULATORY RMATION DISTRIBUTION 'SYS (RIDS)

ACCESSION NBR:8203090767 DOC.DATE: '82/03/01 NOTARIZED:

NO DOCKET ¹

, FACIL:50-397 liPPSS Nuclear Pro.lect'nit

'2P washington 'Public Powe 05000397 AUTH~ NAME, AUTHOR AFF ILIA/ION BOUCHEYPG.DE

'Hashingtan Public Power Supply 'System REC IP ~ NAME REC IP IENT AFFILIATION SCH'NENCERPA ~

Licensing Branch 2

~&

SUBJECT:

Forwards, addi info re control. room chillens Eone oversize drawing of diesel generator exhaust line con(i'gurafion, showing tornado missile protectionPper NRC 820219 requests Aperture card is available in PORE DISTRIBUTION CODE:

BOOIS COPIES iRECEIVED:LTR,, $',ENCL Q SIZE: Q TITLE: PSAR/FSAR AMDTS and /elated Correspondence NOTES:2 copies all matl!PM'5000397 RECIPIENT ID CODE/NAME ACTION:

A/D LICENSNG LIC BR ¹2'A COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME LIC BR ¹g BC AULUCKPR ~

01

'COPIES LTTR ENCL 0

1 1

INTERNAL: ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 N

/DS I/RSB 23 04 1

0 1

1 1

0 3

3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/IiCSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 3

1 2

1 1

1 1

1 1

1 1

1 3

3 1

2 1

1 1

1 1

1 1

1 1

1 EXTERNAL: ACRS 41 FEMA REP DI V 39 NRC PDR 02 NTIS 16 16 1

1 1

1 1

1 BNL(AMDTS ONLY)

LPDR 03 NSIC 05 1

1 1

1

+~ega Ce~k.~'+

TOTAL NURSER OF COPIES REQUIRED:

LTATR P4 ENCL P5

M IV 1

~

f hh VVI 1f fh I

F,I l

~

~

! ~

I t

hk k

F VI I

ll xf I! IJh J

I J I

I,

,m, IF, I, P )

~

fl'

8203090767 82030i

~

PDR ADOCK 05000397 A

PDR Washington Public Power Supply System P.O. Box968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 March l, l982 G02-82-265 SS-L-02-PLP-82-009 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 HRepeg

'OIIN-

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO.

2 SER ISSUES As requested during a phone conversation between Supply System represen-tatives and Mr. R. Auluck and Mr. J. Ridgley of your staff on February 19, 1982, attachments providing additional information on WNP-2 Control Room Chillers and a drawing of the diesel generator exhaust line configuration showing tornado missile protection are submitted.

If you have any further questions, please contact Mr. P.L. Powell, (509) 377-2501 Extension 2909.

Very truly yours, G.

D. Bouchey Deputy Director, Safety and Security PLP/jca Attachments cc:

R Auluck NRC WS Chin

- BPA R

Feil NRC Site J

Ridgley -

NRC

,0

~

CBV>BQHR

~ Q

~ggge( gQ %Alibi

@%5$ ~~<~@

g rf<

~

t

ATTACHMENT I The new control room chillers will be located in the enclosed HVAC rooms I and 2 in the Radwaste Building, elevation 525'.

There is no high energy piping located in these rooms.

The chillers and their installation will conform to Seismic Category I Criteria and the associated documentation will be available for NRC review during the normal review period.

The power supplies for these chillers will come from Class IE power supplies.

k

ATTACHYiENT I I

~Dw S856 The diesel generator exhaust runs vertically t)rough the muffler and goes through a

90 elbow and then through a 45 elbow and terminates flush to the exterior of the penthouse.

The 45 exhaust line con-0 stitutes missile protection for the diesel generator exhaust.

0

~,

g j

C P