Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23144A30623 May 2023Licensing Requirements Manual, Revision 114
ML22144A13418 May 2022Rev. 99 to Licensing Requirements Manual
ML21334A03822 November 2021License Requirement Manual, Revision 110
IR 05000334/202100113 May 2021Integrated Inspection Report 05000334/2021001 and 05000412/2021001
IR 05000334/202000412 February 2021Integrated Inspection Report 05000334/2020004 and 05000412/2020004
ML20335A13123 November 20205 to Licensing Requirements Manual (LRM) Quick Index
ML21127A14817 July 2020ODCM: Controls for RETS and REMP Programs
ML20160A07820 May 2020Licensing Requirements Manual (LRM) Quick Index
ML20125A18217 July 2019ODCM: Controls for RETS and REMP Programs, Rev. 17
ML18179A46730 July 2018FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules
ML18122A17921 April 2018Annual Non-Radiological Environmental Operating Report
L-19-113, Rev. 9 to ODCM: Radiological Environmental Monitoring Program22 January 2018Rev. 9 to ODCM: Radiological Environmental Monitoring Program
ML18102A57328 August 2017Draft Written Examination (Folder 2)
L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules11 August 2017Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules
L-17-104, Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan20 May 2017Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan
05000412/LER-2017-0012 May 2017Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category 1 Piping to Not Seismic Category 1 Piping
LER 17-001-00 For Beaver Valley Power Station, Unit No. 2 Re: Surveillance Testing Rendered Service Water System Inoperable Due to the Coupling of Seismic Category l Piping to Not Seismic Category 1 Piping
L-17-126, ODCM: Index, Matrix and History of ODCM Changes7 November 2016ODCM: Index, Matrix and History of ODCM Changes
ML16277A11328 September 2016Beaver Valley Power Station, Unit Nos. 1 and 2, Request for Licensing Action to Revise the Emergency Plan
ML15125A15629 April 20152014 Annual Environmental Operating Report (Non-Radiological)
L-14-147, ODCM: Index, Matrix and History of ODCM Changes20 March 2013ODCM: Index, Matrix and History of ODCM Changes
ML12123A73130 April 2012Radioactive Effluent Release Report, Rtl# A9.621B - 1/2-ODC-3.03, Revision 11, ODCM: Controls for RETS and REMP Programs
ML13126A04030 December 2011RTL A9.621B, Procedure 1/2-ODC-3.03, Rev. 11, ODCM: Controls for RETS and REMP Programs
ML10265045919 August 2010Post Exam Comments Resolution References (Folder 1)
ML10265044519 August 2010Post Exam Comments and Technical References (Folder 1)
ML0527202915 November 2009Current Facility Operating License No. DPR-66, Technical Specifications, Revised 03/02/2018
ML0929503055 November 2009Technical Specifications, Appendices a, B, and C
ML07172025214 June 2007Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers
ML07039028421 February 2007Improved Technical Specifications
ML07123012031 December 2006RTL A9.621B, Annual Radioactive Effluent Release Report for 2006, Rev. 5 to Offsite Dose Calculation Manual Changes.
ML06346038812 December 2006White Paper Email from Brian Sepelak
L-05-072, Attachment 2, Beaver Valley Power Station - Units 1 & 2, Annual Radioactive Effluent Release Report 2004, Offsite Dose Calculation Manual Changes27 April 2005Attachment 2, Beaver Valley Power Station - Units 1 & 2, Annual Radioactive Effluent Release Report 2004, Offsite Dose Calculation Manual Changes
ML05104008431 March 2005WCAP-16385-NP, Rev 1, F* Tube Plugging Criterion for Tubes with Degradation in the Tubesheet Roll Expansion Region of the Beaver Valley Unit 2 Steam Generators.
IR 05000334/20040059 November 2004IR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability Evaluations
ML0431003584 November 2004Units, 1 and 2, Tech Spec Pages for Amendments 263 & 144 Increasing Flexibility in Mode Restraints
L-04-040, License Amendment Request Nos. 321 and 193, Modifying Technical Specification Requirements for Mode Change Limitations in Specifications 3.0.4 and 4.0.4 and the Associated Technical Specification Bases22 March 2004License Amendment Request Nos. 321 and 193, Modifying Technical Specification Requirements for Mode Change Limitations in Specifications 3.0.4 and 4.0.4 and the Associated Technical Specification Bases
ML03336056425 November 2003Technical Specifications, Modify Technical Specifications 4.0.1 & 4.0.3 to Be Consistent with Improved Standard Technical Specifications
L-03-049, License Amendment Request Nos. 313 & 18626 March 2003License Amendment Request Nos. 313 & 186
L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program7 October 1999Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program
ML20217B98517 March 1998Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected
ML20248L6625 March 1998Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam for Test Administered on 971215-18 at Facility
IR 05000334/199700618 September 1997Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program
IR 05000334/199700518 August 1997Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support
IR 05000334/199700223 May 1997Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly5 August 1996Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly
ML20065E80824 March 1994Responds to Notice of Violation & Proposed Imposition of Civil Penalty from Insp Rept 50-412/93-81.Corrective Actions:Required Operability of EDGs & EDG Load Sequencers Verified for Mode 5 at Time of Discovery.Fee Paid
ML20045F4712 July 1993LER 93-009-00:on 930607,high Radiation Area Barrier Was Unlocked Due to Personnel Error.Comprehensive Confirmation Survey Performed,Personnel Interviewed & Task Force Formed. W/930702 Ltr
ML20003C11520 February 1981LER 81-013/03L-0:on 810121,routine Lab Analysis Showed That Methyl Iodide Removal Efficiency for Bed Had Fallen Below Acceptable Level Resulting in Inoperability of Main Filter Bank 1A.Caused by Worn Out Charcoal Bed.Bank Repacked