July 20, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

BULLETIN 2004-01, ?INSPECTIONS OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS, RESPONSE FOR MILLSTONE POWER STATION, UNIT NO. 3 (TAC NO.

MC3490)

Dear Mr. Christian:

On May 28, 2004, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2004-01,

?Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, to the industry. This bulletin informed addressees that current methods of inspecting the pressurizer penetrations and steam space piping connections fabricated from Alloy 82/182/600 materials may need to be supplemented with additional measures (e.g., bare-metal visual inspections) to detect pressurizer penetration and steam space piping connection flaws or leakage. The bulletin requested that addressees provide the NRC with information related to the materials of construction, the inspections that have been performed, and the inspections which will be performed to verify the integrity of the pressurizer penetrations and steam space piping connections.

By letter dated July 27, 2004 (and by a supplemental letter dated December 15, 2005),

Dominion Nuclear Connecticut (DNC) provided its responses to items 1a, 1b, 1c, and 1d of Bulletin 2004-01 for Millstone Power Station, Unit No. 3 (MPS3). DNCs responses described its materials of fabrication and past, current, and future pressurizer penetrations and steam space piping inspection programs at MPS3.

DNCs response to item 1a reported that some of the materials used in the fabrication of the pressurizer penetrations and steam space piping connections were Alloy 82/182/600 materials.

This reply required you to provide further responses to the remaining items in the bulletin.

In response to item 1b, DNC described prior inspections and inspection results of pressurizer penetrations and steam space piping connections which had been performed at MPS3. DNCs response included the basis for concluding that MPS3 satisfies the applicable regulatory requirements related to the integrity of pressurizer penetrations and steam space piping connections.

In response to item 1c in the bulletin, DNC provided a description of the Alloy 82/182/600 pressurizer penetration and steam space piping connection inspection program that will be

D. Christian implemented at MPS3 during the next, and subsequent, refueling outages. The description included the items to be inspected; the percent coverage that would be performed at each location; the inspection methods to be used; the qualification standards for the inspection methods and personnel; the process used to resolve any inspection indications; the inspection documentation to be generated; and the basis for concluding that MPS3 will satisfy the applicable regulatory requirements related to the structural and leakage integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections are found, DNC indicated that a follow-up nondestructive examination (NDE) will be performed to characterize flaws in the leaking penetrations. DNC provided its plans for expansion of the scope of the NDE to be performed if circumferential flaws are found in any portion of the leaking pressurizer penetrations or steam space piping connections.

In response to item 1d in the bulletin, DNC explained why the inspection program identified in the response to item 1c in the bulletin is adequate for the purpose of maintaining the integrity of the MPS3 reactor coolant pressure boundary and for meeting all applicable regulatory requirements which pertain to MPS3.

By letter dated July 27, 2004, you provided a response to item 2a in Bulletin 2004-01. This letter provided a statement to the NRC indicating that the inspections described in your response to item 1c of the bulletin were completed during a recent MPS3 outage and a description of the as-found condition of the locations inspected was provided. DNC also described any findings of relevant indications of through-wall leakage and follow-up NDE performed to characterize flaws in leaking penetrations or steam space piping connections. A summary of all relevant indications found by NDE, a summary of the disposition of any findings of boric acid, and a description of any corrective actions taken and/or repairs made as a result of the indications found was also provided in this letter.

The NRC staff has completed its activities associated with the review of DNCs responses to Bulletin 2004-01 and finds DNCs response to be acceptable. It should be noted that industry commitments or staff regulatory actions may result in the need for you to modify your plans for the inspection and repair of items discussed in Bulletin 2004-01. It is the staffs expectation that you will revise your plan for the inspection and repair of items discussed in Bulletin 2004-01 consistent with other industry commitments or staff regulatory actions. This closes the staffs efforts with regard to the review of the Bulletin 2004-01 response for MPS3. Please contact me at (301) 415-1484 if you have any questions on this issue.

Sincerely,

/RA/

Victor Nerses, Sr. Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page

D. Christian implemented at MPS3 during the next, and subsequent, refueling outages. The description included the items to be inspected; the percent coverage that would be performed at each location; the inspection methods to be used; the qualification standards for the inspection methods and personnel; the process used to resolve any inspection indications; the inspection documentation to be generated; and the basis for concluding that MPS3 will satisfy the applicable regulatory requirements related to the structural and leakage integrity of pressurizer penetrations and steam space piping connections. If leaking pressurizer penetrations or steam space piping connections are found, DNC indicated that a follow-up nondestructive examination (NDE) will be performed to characterize flaws in the leaking penetrations. DNC provided its plans for expansion of the scope of the NDE to be performed if circumferential flaws are found in any portion of the leaking pressurizer penetrations or steam space piping connections.

In response to item 1d in the bulletin, DNC explained why the inspection program identified in the response to item 1c in the bulletin is adequate for the purpose of maintaining the integrity of the MPS3 reactor coolant pressure boundary and for meeting all applicable regulatory requirements which pertain to MPS3.

By letter dated July 27, 2004, you provided a response to item 2a in Bulletin 2004-01. This letter provided a statement to the NRC indicating that the inspections described in your response to item 1c of the bulletin were completed during a recent MPS3 outage and a description of the as-found condition of the locations inspected was provided. DNC also described any findings of relevant indications of through-wall leakage and follow-up NDE performed to characterize flaws in leaking penetrations or steam space piping connections. A summary of all relevant indications found by NDE, a summary of the disposition of any findings of boric acid, and a description of any corrective actions taken and/or repairs made as a result of the indications found was also provided in this letter.

The NRC staff has completed its activities associated with the review of DNCs responses to Bulletin 2004-01 and finds DNCs response to be acceptable. It should be noted that industry commitments or staff regulatory actions may result in the need for you to modify your plans for the inspection and repair of items discussed in Bulletin 2004-01. It is the staffs expectation that you will revise your plan for the inspection and repair of items discussed in Bulletin 2004-01 consistent with other industry commitments or staff regulatory actions. This closes the staffs efforts with regard to the review of the Bulletin 2004-01 response for MPS3. Please contact me at (301) 415-1484 if you have any questions on this issue.

Sincerely,

/RA/

Victor Nerses, Sr. Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc: See next page DISTRIBUTION:

Non-Public MMitchell RidsNrrPMTColburn RidsNrrPMVNerses RidsNrrLACRaynor RidsNrrDorlDpr LPL1-2 R/F RidsNrrDorlLPL1-2 RidsOgcRp RidsNrrDssSnpb RidsAcrsAcnwMailCenter ADAMS Accession Number: ML061430011 OFFICE LPLI-2/PM LPLI-2/LA LPLI-2/BC (A)

NAME VNerses CRaynor BPoole DATE 7/19/06 7/18/06 7/20/06 OFFICIAL RECORD COPY

Millstone Power Station, Unit No. 3 cc:

Lillilan M. Cuoco, Esquire Mr. Joseph Roy, Senior Counsel Director of Operations Dominion Resources Services, Inc. Massachusetts Municipal Wholesale Building 475, 5th Floor Electric Company Rope Ferry Road Moody Street Waterford, CT 06385 P.O. Box 426 Ludlow, MA 01056 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Mr. J. Alan Price Department of Environmental Protection Site Vice President 79 Elm Street Dominion Nuclear Connecticut, Inc.

Hartford, CT 06106-5127 Building 475, 5th Floor Rope Ferry Road Regional Administrator, Region I Waterford, CT 06385 U.S. Nuclear Regulatory Commission 475 Allendale Road Mr. Chris Funderburk King of Prussia, PA 19406 Director, Nuclear Licensing and Operations Support First Selectmen Dominion Resources Services, Inc.

Town of Waterford 5000 Dominion Boulevard 15 Rope Ferry Road Glen Allen, VA 23060-6711 Waterford, CT 06385 Mr. David W. Dodson Mr. J. W. "Bill" Sheehan Licensing Supervisor Co-Chair NEAC Dominion Nuclear Connecticut, Inc.

19 Laurel Crest Drive Building 475, 5th Floor Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870