Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20005F251 | 5 January 1990 | Shoreham Nuclear Power Station Defueled Sar. |
ML20148A485 | 29 February 1988 | Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys |
ML20149M588 | 18 September 1987 | Errata to SALP Rept 50-322/86-99 for Mar 1986 - Jul 1987, Revising Page 38 & Table 5 |
IR 05000322/1987005 | 15 May 1987 | Insp Rept 50-322/87-05 on 870216-0331.Violation Noted: Inadequate Mod Procedure for Work Performed on Bus 103 Discovered as Cause of 870318 Loss of Offsite Power Event. Weakness in Valve Locking Device Program Also Noted |
ML20214U202 | 31 January 1987 | Technical Rept 86.2SH Verification of IPE for Shoreham. W/ 870313 Release Memo |
IR 05000322/1985024 | 8 July 1985 | Insp Rept 50-322/85-24 on 850516-0618.No Violation Noted. Major Areas Inspected:Isolation of RCS Pressure from Low Pressure Re ECCS Sys Outside Containment & Disablement of 4,160-volt Emergency Bus auto-transfer Capability |
ML20128H188 | 24 June 1985 | Affidavit of Jd Leonard Re Issuance of Low Power License. Certificate of Svc Encl |
ML20244B445 | 19 June 1985 | Forwards Response of Licensee to Motion for Stay of Low Power License,For Filing.W/Certificate of Svc |
ML20127B557 | 19 June 1985 | Response Opposing Suffolk County & State of Ny 850617 Motion for Stay of Low Power License.Motion Untimely & Fails to Satisfy Commission Stay Criteria.Unexecuted Affidavit of Jd Leonard & Certificates of Svc Encl |
ML20117H926 | 13 May 1985 | Affidavit of Ja Notaro & WE Gunther Re Steps Involved in Sys Testing During Phases I-IV |
ML20108B691 | 4 March 1985 | Petition for Review of ALAB-800,reversing ASLB Disposition of Security Contention & Vacating Authorization for Phase III & IV Low Power Testing License.Affidavit of Jl Leonard & Certificate of Svc Encl |
ML20100J340 | 25 February 1985 | Rev 12 to Procedure 23.307.01, Emergency Diesel Generators |
SNRC-1140, Discusses NRC Concerns Re Postulated Failure in Electrical Circuit Breaker 460 Between Reserve Station Svc Transformer & Bus 11 That Can Disable Both Alternate Ac Power Supplies. Util to Rack Down 4 Kv Breaker 460 | 29 January 1985 | Discusses NRC Concerns Re Postulated Failure in Electrical Circuit Breaker 460 Between Reserve Station Svc Transformer & Bus 11 That Can Disable Both Alternate Ac Power Supplies. Util to Rack Down 4 Kv Breaker 460 |
SNRC-1078, Forwards Revs to FSAR Chapter 13, Conduct of Operations & Section 17.2, QA During Operations Phase, Reflecting Operational Readiness.Revs Will Be Included in Forthcoming Rev 33 to FSAR | 5 September 1984 | Forwards Revs to FSAR Chapter 13, Conduct of Operations & Section 17.2, QA During Operations Phase, Reflecting Operational Readiness.Revs Will Be Included in Forthcoming Rev 33 to FSAR |
ML20096C462 | 31 August 1984 | Proposed Finding of Fact Based on Evidence Presented on 840424-25 & 840730-0808 & ASLB 840724 Order Granting in Part & Denying in Part Util Motion for Summary Disposition on Phases I & II of Low Power Testing |
ML20096C471 | 31 August 1984 | Post-hearing Brief in Support of Application for Exemption Re Phases I-IV of Low Power Testing |
ML20093F345 | 16 July 1984 | Supplemental Testimony of WE Gunther & Wg Schiffmacher Re Operating Procedures for Ac Power Sources |
SNRC-1060, Advises That,Based on Results of Analyses,All Accident Success & Transient Criteria Satisfied W/Or W/O Qualified Onsite Power Source,In Response to 840516 Order | 28 June 1984 | Advises That,Based on Results of Analyses,All Accident Success & Transient Criteria Satisfied W/Or W/O Qualified Onsite Power Source,In Response to 840516 Order |
ML20092H437 | 22 June 1984 | Response to Util 840523 Request for Production of Documents. Certificate of Svc Encl.Related Correspondence |
SNRC-1047, Commits to Mobile Diesel Generator Changes Per Sser 5 Agreed Upon in Prior Telcon W/Nrc Re Fire Protection. Proposed Mods Meet NRC Conditions.Util Proceeding W/Changes Accordingly | 6 June 1984 | Commits to Mobile Diesel Generator Changes Per Sser 5 Agreed Upon in Prior Telcon W/Nrc Re Fire Protection. Proposed Mods Meet NRC Conditions.Util Proceeding W/Changes Accordingly |
ML20083R042 | 20 April 1984 | Testimony of Wg Schiffmacher Re Util Capability to Provide Ac Power to Plant Under Variety of Operating Conditions. W/Two Oversize Drawings.Aperture Cards Are Available in PDR |
ML20083R019 | 20 April 1984 | Testimony of WE Gunther Re Steps Involved in Phases of Low Power Testing |
SNRC-1036, Provides Addl Response to NRC Questions Re Supplemental Motion for Low Power License.Actual Power Level & Time History of Startup Phase of Plant Difficult to Predict Due to Unplanned Shutdowns During Power Ascension Test Program | 11 April 1984 | Provides Addl Response to NRC Questions Re Supplemental Motion for Low Power License.Actual Power Level & Time History of Startup Phase of Plant Difficult to Predict Due to Unplanned Shutdowns During Power Ascension Test Program |
ML20087M983 | 30 March 1984 | Affidavit of Ja Notaro & WE Gunther in Support of 840320 Supplemental Motion for Low Power OL |
ML20087M975 | 22 March 1984 | Affidavit of Wg Schiffmacher in Support of 840320 Supplemental Motion for Low Power OL |
SNRC-1026, Forwards Supplemental Motion for Low Power OL | 21 March 1984 | Forwards Supplemental Motion for Low Power OL |
ML20087H792 | 20 March 1984 | Supplemental Motion for Low Power Ol.Unexecuted Affidavits of Ja Notaro,Wg Schiffmacher,Gg Sherwood,As Rao & EC Eckert Encl.Certificate of Svc Also Encl |
SNRC-1013, Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Encl Addresses Each NRC Position & Describes Actions Taken by Util in Response | 9 March 1984 | Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Encl Addresses Each NRC Position & Describes Actions Taken by Util in Response |
IR 05000322/1982011 | 12 July 1982 | Forwards IE Insp Rept 50-322/82-11 |
ML20054K907 | 15 June 1982 | IE Insp Rept 50-322/82-11 on 820511-14 & 17-20.Noncompliance Noted:Failure to Conduct Surveillance Tests of Battery Sys |
ML19350E199 | 15 June 1981 | Forwards Responses to NRC Generic Ltr 81-04 Re Loss of Ac Power.Includes Description of Transmission & Power Distribution Sys & Actions for Power Restoration |