Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML17353A19221 December 2017Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018
NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 201821 December 2017Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018
LIC-17-0001, License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning31 March 2017License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning
ML12325A39821 September 20122012-09 Draft Retake Written Exam
ML12291A73221 September 20122012-09 Final Written Exam
ML12040A31531 December 2011Final Report, Dec. 2011, Materials Reliability Program: Coordinated PWR Reactor Vessel Surveillance Program (Crvsp) Guidelines (MRP-326), Section 6-1 to End
ML11146A05116 May 2011TDB-VI Technical Data Book - Core Operating Limit Report, Revision 40
LIC-11-0041, Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)5 April 2011Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)
ML11088017122 March 2011Technical Data Book, RCS Pressure and Temperature Limits Report Evaluation of Reactor Vessel Surveillance Data Pertinent to the Fort Calhoun Reactor Vessel Beltline Materials
ML1011006789 April 2010Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)
ML1011206526 April 2010TDB-IX, Technical Data Book, RCS Pressure and Temperature Limits Report
ML10063082818 February 2010TDB-VI, Technical Data Book, Core Operating Limits Report, Rev. 39, Change EC 44759
ML10063082920 November 2009Technical Data Book, Revision 39, Core Operating Limit Report
ML0926502841 September 2009TDB-VI Technical Data Book - Core Operating Limit Report
ML09167046628 May 2009Transmittal of Fort Calhoun Station Technical Data Book (TDB)-IV, Revision 37, Core Operating Limit Report
LIC-08-0071, Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 427 May 2008Transmittal of Fort Calhoun, Unit 1, Reactor Coolant System Pressure and Temperature Limits Report, Revision 4
ML08156021722 May 2008Revision 36 to Technical Data Book TDB-VI, Core Operating Limit Report, Change No. EC 42580, Technical Specifications Amendment 252
ML08149034718 May 2008Change No. EC 35639/EC 43060, Rev. 4, to TDB-IX, Technical Data Book, RCS Pressure and Temperature Limits Report
LIC-08-0013, Transmittal of Editorial Corrections to the Pressure Temperature Limits Report (PTLR)11 February 2008Transmittal of Editorial Corrections to the Pressure Temperature Limits Report (PTLR)
LIC-06-0138, Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR)29 November 2006Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR)
ML06341030122 November 2006TDB-IX, Technical Data Book RCS Pressure and Temperature Limits Report
ML06341029716 November 2006Technical Data Book, Core Operating Limit Report
ML06304068017 October 2006Revision 32 to Technical Data Book, Change No. EC 38634
ML05230013825 February 200607/2005-Draft Written Exam
ML0606902831 February 2006Technical Specifications, Deletion of Shutdown Margin During Low Power Testing from TS and Various Other Editorial and Administrative Changes
LIC-05-0098, License Amendment Request (Lar), Deletion of Shutdown Margin Surveillance Requirement and Miscellaneous Administrative Changes.11 August 2005License Amendment Request (Lar), Deletion of Shutdown Margin Surveillance Requirement and Miscellaneous Administrative Changes.
ML05202031715 July 2005July 2005-Initial Exam-FINAL Written Exam
LIC-05-0081, Transmittal of Revision 1 of Fort Calhoun Station, Unit, Pressure Temperature Limits Report (PTLR)6 July 2005Transmittal of Revision 1 of Fort Calhoun Station, Unit, Pressure Temperature Limits Report (PTLR)
ML0519503775 July 2005Technical Data Book
ML05194056230 June 2005Station,Technical Data Book TDB-VI, Rev. 31, Core Operating Limit Report.
ML05096020324 March 2005BDB-VI, Technical Data Book, Core Operating Limit Report
ML04020075716 January 2004Issuance of License Amendment 224 Revising the Renewed Operating License and the TSs to Increase the Licensed Rated Power by 1.6 Percent from 1500 Megawatts Thermal (Mwt) to 1524 Mwt
LIC-03-0124, Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 010 September 2003Transmittal of Fort Calhoun Station (FCS) Pressure Temperature Limits Report (Ptlr), Revision 0
LIC-03-0122, PWR Fuel Design Criteria & Statistical Setpoint Calculations for Fort Calhoun Station Measurement Uncertainty Recapture Power Uprate28 August 2003PWR Fuel Design Criteria & Statistical Setpoint Calculations for Fort Calhoun Station Measurement Uncertainty Recapture Power Uprate
ML03231020015 August 2003Tech Spec Pages for Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis
ML03230030515 August 2003License Amendment No. 221, Use of a Pressure Temperature Limits Report (Ptlr), Change the Minimum Boltup Temperature, Revise the Low Temperature Overpressure Protection (LTOP) Methodology and Analysis
LIC-03-0110, Unit No.1 TS Updated for NRC Comments on Pending Amendment Request on Pressure-Temperature Limits Report5 August 2003Unit No.1 TS Updated for NRC Comments on Pending Amendment Request on Pressure-Temperature Limits Report
LIC-03-0067, Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate18 July 2003Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate
ML03202021818 July 2003Ltr Environmental Assessment Relating to Exemption from the Requirements of Appendix G to 10 CFR Part 50
LIC-03-0081, Response to Request for Additional Information, Pressure - Temperature Limits Report Amendment Request; Low Temperature Over Pressure4 June 2003Response to Request for Additional Information, Pressure - Temperature Limits Report Amendment Request; Low Temperature Over Pressure
LIC-03-0052, Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request10 April 2003Response to Request for Additional for Information, Pressure-Temperature Limits Report Amendment Request
ML02121003322 April 2002Technical Specifications for Amendment No. 207, Deletes TS Figures 2-1A (Reactor Coolant System (RCS) - Temperature Limits for Heatup) & 2-1B (RCS Pressure Temperature Limits for Cooldown) & Replaces with Figure 2-1
ML02295039815 March 2002Low Temperature Overpressure Protection Final Report, Revision 1, Attachment 4
LIC-02-0109, Low Temperature Overpressure Protection Final Report, Revision 1, Table of Contents - Attachment a15 March 2002Low Temperature Overpressure Protection Final Report, Revision 1, Table of Contents - Attachment a
LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable6 August 1999Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable
ML20209G5598 July 1999Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept
ML20195B44426 May 1999Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept
LIC-99-0045, Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl26 May 1999Forwards Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated NDTT Shift Curve & LTOP Limits & Values from FCS TS to OPPD Controlled Document.Rev 3 to TR CE NPSD-683 & Supporting TSs Encl
ML20195B45217 May 1999Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr)
ML20199L89530 January 1998Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept