Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23135A201 | 6 December 2022 | EQSD-I, Rev 18, Equipment Qualification Design Basis Document |
ML22152A194 | 18 May 2022 | EQSD-I, Revision 15, Equipment Qualification Design Basis Document |
ML22152A204 | 18 May 2022 | EQSD-I, Revision 16, Equipment Qualification Design Basis Document |
IR 05000482/2022001 | 25 April 2022 | Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 |
ET 22-0005, Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating | 13 April 2022 | Response to Request for Additional Information Regarding License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating |
ML23135A207 | 6 April 2022 | EQSD-I, Rev 17, Equipment Qualification Design Basis Document |
ET 21-0010, License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation | 29 September 2021 | License Amendment Request - Revision to Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation |
ET 21-0004, License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating | 29 September 2021 | License Amendment Request - Diesel Generator Completion Time Extension for Technical Specification 3.8.1, AC Sources - Operating |
ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 | 12 August 2021 | Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 |
ML20140A225 | 19 May 2020 | Final ASP Analysis - Wolf Creek (LER 482-96-001) |
ET 19-0020, Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation | 13 November 2019 | Supplemental Response to Request for Additional Information Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation |
ML17291A008 | 23 October 2017 | Regulatory Audit Plan for November 7-8, 2017, Site Audit in Support of the License Amendment Request to Incorporate New Technical Specification 3.7.20 (CAC No.: MF9961, EPID No. L-2017-LLA-0262 |
ML17108A730 | 12 April 2017 | Final ASP Analysis-Wolf Creek (LER 482-2016-001-01) |
ML16235A132 | 19 August 2016 | NRC Inspection Report 05000482/2016008; January 1, 2016 Through June 29, 2016; Preliminary White Finding |
IR 05000482/2016002 | 3 August 2016 | NRC Integrated Inspection Report 05000482/2016002 |
ET 16-0005, Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval | 23 February 2016 | Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval |
ML16036A381 | 13 November 2015 | 2015-11-Proposed Written Exam |
IR 05000482/2013005 | 10 February 2014 | IR 05000482-13-005; 09/29/2013 - 12/31/2013; Wolf Creek Generating Station; Integrated Resident and Regional Report; Licensed Operator Requalification Program; Maintenance Risk Assessments and Emergent Work Control, Problem Identification a |
ML14002A190 | 6 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14023A614 | 3 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Wolf Creek Generating Station, TAC No.: MF0788 |
ML13297A492 | 24 October 2013 | NOED Oct 2013 Req Response |
ET 13-0036, Submittal of Information Related to the Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Lnverters - Operating, and TS 3.8.9,. | 22 October 2013 | Submittal of Information Related to the Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Lnverters - Operating, and TS 3.8.9,. |
ML13203A329 | 22 July 2013 | IR 05000482-13-010, June 3, 2013 Through June 7, 2013, Wolf Creek Generating Station, Inspection Procedure 95002 Supplemental Inspection Report and Assessment Follow-Up Letter |
ML13172A417 | 21 June 2013 | Notice of Enforcement Discretion for Wolf Creek Nuclear Operating Corporation (TAC No. MF2270, NOED No. 13-4-002) |
WO 13-0050, Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating. | 19 June 2013 | Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation (LCO) 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Inverters - Operating, and TS 3.8.9, Distribution Systems - Operating. |
IR 05000482/2013002 | 6 May 2013 | IR 05000482-13-002, 01/01/2013 - 03/30/2013, Wolf Creek Generating Station, Integrated Resident and Regional Report; Follow-up of Events and Notices of Enforcement Discretion |
IR 05000482/2013009 | 6 May 2013 | IR 05000482-13-009; 3/4/2013 - 3/8/2013; Wolf Creek Generating Station; Supplemental Inspection Inspection Procedure 95001 |
ML13073A205 | 15 March 2013 | YT020130045 - Wolf Creek Generating Station - Enclosure - Preliminary Accident Sequence Precursor Analysis of January 2012 Loss of Offsite Power Event |
IR 05000482/2012005 | 13 February 2013 | IR 05000482-12-005 on 09/29/2012; 12/31/2012; Wolf Creek Generating Station, Integrated Resident and Regional Report; Licensed Operator Requalification and Surveillance Testing |
IR 05000482/2012009 | 6 August 2012 | IR 05000482-12-009; 05/21/2012 - 08/06/2012; Wolf Creek Generating Station; Augmented Inspection Team Follow-up Inspection; Maintenance Effectiveness; Plant Modifications |
WO 11-0086, Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating | 30 November 2011 | Application to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating |
IR 05000482/2011003 | 12 August 2011 | IR 05000482-11-003 & Notice of Violation, on 04/1/2011 6/30/2011, Wolf Creek Generating Station, Integrated Resident Report, Adverse Weather Protection, Equipment Alignments, Inservice Inspection Activities, Post Maintenance Testing, Event |
ML112240223 | 12 August 2011 | IR 05000482-11-003 & Notice of Violation, on 04/1/2011 6/30/2011, Wolf Creek Generating Station, Integrated Resident Report, Adverse Weather Protection, Equipment Alignments, Inservice Inspection Activities, Post Maintenance Testing, Event |
WO 11-0033, Cancellation of Licensee Event Report 2011-001-00, Potential for a CVCS Through-Weld Leak to Affect Reactor Coolant System Inventory After a Loss of Coolant Accident. | 30 June 2011 | Cancellation of Licensee Event Report 2011-001-00, Potential for a CVCS Through-Weld Leak to Affect Reactor Coolant System Inventory After a Loss of Coolant Accident. |
WM 09-0065, Response to NRC Integrated Inspection Report 05000482/2009004 | 9 December 2009 | Response to NRC Integrated Inspection Report 05000482/2009004 |
ML093380148 | 20 November 2009 | Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S |
ML092460714 | 28 September 2009 | Summary of Meeting with Union Electric Co., and Wolf Creek, to Discuss Draft Requests for Additional Information on GL 2004-02 for Callaway, Unit 1, and Wolf Creek |
ML092030628 | 31 July 2009 | Request for Additional Information (RAI) Regarding Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (Tac No. MC4731) |
ET 08-0053, Corporation Response to Request for Additional Information Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 22 December 2008 | Corporation Response to Request for Additional Information Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML081260608 | 31 May 2008 | NUREG-1437, Supp No. 32, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Final Report |
ML080790469 | 10 April 2008 | Summary of Teleconference with Wolf Creek Nuclear Operating Corporation, Ameren Union Electric Company for Callaway Plant, and Performance Contracting, Inc. Containment Sump Head Loss Testing |
ET 08-0003, Operating Corporation Response to Request for Additional Information Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 29 February 2008 | Operating Corporation Response to Request for Additional Information Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
ML072540026 | 30 September 2007 | NUREG-1437, Suppl 32, Dfc, Generic Environmental Impact Statement for the License Renewal of Nuclear Plants: Regarding Wolf Creek Generating Station, Draft for Comment. |
ML070240554 | 7 February 2007 | Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Wolf Creek Generating Station |
ML062770305 | 27 September 2006 | Applicant'S Environmental Report; Operating License Renewal Stage |
ML053490174 | 26 April 2006 | Issuance of Amendment Extended Diesel Generator Completion Times |
WO 06-0014, Supplement to Revision to Technical Specifications - Extensions of AC Electrical Power Distribution Completion Times | 6 March 2006 | Supplement to Revision to Technical Specifications - Extensions of AC Electrical Power Distribution Completion Times |
ML060380708 | 9 February 2006 | RAI, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. |
ET 05-0016, Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time | 31 August 2005 | Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time |
ET 05-0018, Operating Corporation, Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | 31 August 2005 | Operating Corporation, Response to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |