Issue date | Title | |
---|---|---|
ML22290A101 | 29 November 2022 | Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits |
RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits | 20 December 2021 | License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits |
ML20309A752 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20309A728 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
ML20309A773 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
IR 05000369/2020012 | 31 July 2020 | NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000369/2020012 and 05000370/2020012 |
ML20095H470 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 15 |
ML20093D926 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 |
ML20093G903 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 10 |
ML17356A178 | 13 December 2017 | Attachment 1: WCAP-18265-NP, Rev. 0, Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 & 2 Reactor Vessel Internals. |
MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate | 25 September 2017 | Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate |
ML17237A045 | 17 August 2017 | FOL Revisions and Loep |
ML17171A278 | 12 June 2017 | Revision 163 to Issue MNS-SLC-16.7.12 Leading Edge Flow Meter |
ML17087A272 | 22 March 2017 | Renewed Facility Operating License - Amendment 293 |
ML16305A094 | 20 October 2016 | Renewed Facility Operating License |
ML16305A141 | 20 October 2016 | Document Transmittal Regarding Issue MNS FOL U-2, Rev. 3 |
ML16294A252 | 12 October 2016 | Document Transmittal Regarding Issue MNS FOL U-1 Amend. 288 |
ML16250A014 | 29 August 2016 | Amendment 287 |
ML16243A355 | 17 August 2016 | Renewed Facility Operating License, Amendment 284 |
ML16159A336 | 19 July 2016 | Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) |
ML16139A458 | 10 May 2016 | Facility Operating License NPF-9 Amendment No. 283 |
ML16132A247 | 3 May 2016 | Facility Operating License No. NPF-9, Amendment No. 282 |
ML16133A441 | 2 May 2016 | Facility Operating License NPF-17, Amendment 261 |
ML16133A440 | 2 May 2016 | Renewed Facility Operating License NPF-009, Amendment 281 |
ML15258A058 | 9 September 2015 | Amendment 280 |
ML15258A059 | 9 September 2015 | Renewed Facility Operating License |
ML15258A055 | 8 September 2015 | Renewed Facility Operating License |
ML15174A173 | 24 August 2015 | Issuance of Amendments Regarding Technical Specification Definition of Rated Thermal Power |
RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 | 15 July 2015 | License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 |
RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot | 15 July 2015 | Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn |
ML15107A006 | 16 April 2015 | NRR E-mail Capture - Acceptance Review for Removal of Superseded TS Requirement LAR |
ML15119A218 | 7 April 2015 | Technical Specification (TS) and Tech Spec Bases (Tsb) Manual |
ML15027A366 | 25 March 2015 | Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement | 23 March 2015 | Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement |
ML15097A010 | 23 March 2015 | McGuire Nuclear Station (Mns), Units 1 and 2 - Technical Specifications (TS) Section 1.1 Definitions Removal of Superseded TS Requirement |
MNS-15-016, Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments | 19 March 2015 | Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments |
RA-15-0005, Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees | 5 February 2015 | Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees |
IR 05000369/2014005 | 3 February 2015 | IR 05000369/2014005, IR 05000370/2014005; 10/01/2014 - 12/31/2014; McGuire Nuclear Station, Units 1 and 2; Fire Protection and Refueling and Other Outage Activities |
MNS-14-102, Emergency Response Data System Changes | 16 December 2014 | Emergency Response Data System Changes |
ML14205A444 | 15 July 2014 | Technical Specifications Bases Update |
CNS-14-081, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI) | 27 June 2014 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI) |
ML14128A352 | 22 May 2014 | RAI LAR Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML14063A278 | 25 February 2014 | Duke Energy Carolinas, LLC (Duke Energy): Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model |
CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology | 14 November 2013 | License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology |
ML13151A200 | 4 June 2013 | Correction Letter to Issuance of Amendment Nos. 269 and 249, Measurement Uncertainty Recapture Power Uprate |
ML13073A041 | 16 May 2013 | Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate |
ML13114A292 | 10 April 2013 | Cycle 23, Revision 0, Core Operating Limits Report |
ML13079A330 | 7 March 2013 | Restatement of License Condition Proposed in August 15, 2012 Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate |
ML13024A406 | 2 January 2013 | Revision to a Response to a Request for Additional Information Regarding License Amendment Request Related to Measurement Uncertainty Recapture Power Uprate |
ML12314A031 | 16 November 2012 | Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3)(ii) Re Significant ECCS Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation |