ML22250A709 | 7 September 2022 | Generation Station, Emergency Plan, Revision 74 |
ML22173A087 | 21 June 2022 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 73 |
ML21203A138 | 22 July 2021 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 70 |
ML21203A152 | 22 July 2021 | Generation Station (Pvngs), Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 71 |
ML18341A159 | 6 December 2018 | Emergency Plan, Revision 63 |
ML18269A362 | 25 September 2018 | ISFSI - Emergency Plan, Revision 62 |
ML18172A007 | 12 June 2018 | Independent Spent Fuel Storage Installation - PVNGS Emergency Plan, Revision 61 |
ML17269A264 | 21 September 2017 | Enclosure 1: Palo Verde, Units 1, 2, and 3, and ISFSI - Emergency Plan, Revision 60 |
ML17269A334 | 15 September 2017 | Emergency Plan, Rev. 59. Part 1 of 2 |
ML011010325 | 16 March 2001 | . Docket Nos. Stn 50-528/529/530 Emergency Plan Implementing Procedure Update. EPIP-07 |
NRC Generic Letter 1991-14 | 23 September 1991 | NRC Generic Letter 1991-014: Emergency Telecommunications |
Information Notice 1989-25, Unauthorized Transfer of Ownership or Control of Licensed Activities | 7 March 1989 | Unauthorized Transfer of Ownership or Control of Licensed Activities |
Information Notice 1989-26, Instrument Air Supply to Safety-Related Equipment | 7 March 1989 | Instrument Air Supply to Safety-Related Equipment |
Information Notice 1989-24, Nuclear Criticality Safety | 6 March 1989 | Nuclear Criticality Safety |
Information Notice 1989-23, Environmental Qualification of Litton-Veam Cir Series Electrical Connectors | 3 March 1989 | Environmental Qualification of Litton-Veam Cir Series Electrical Connectors |
Information Notice 1989-21, Changes in Performance Characteristics of Molded-Case Circuit Breakers | 27 February 1989 | Changes in Performance Characteristics of Molded-Case Circuit Breakers |
Information Notice 1989-20, Weld Failures in a Pump of Byron-Jackson Design | 24 February 1989 | Weld Failures in a Pump of Byron-Jackson Design |
Information Notice 1986-97, Emergency Communications System | 28 November 1986 | Emergency Communications System |
Information Notice 1985-62, Backup Telephone Number to the NRC Operations Center | 23 July 1985 | Backup Telephone Number to the NRC Operations Center |
ML17298C171 | 23 May 1985 | Revs 0 to Administrative Procedures 7N409.03.00 Re Emergency Plan Review & approval,7N409.04.00 Re Emergency Plan Change notice,7N409.07.00 Re Emergency Plan Implementing Procedures Approval & 7N409.08 Re Emergency Preparedness Drills |
ML20100B137 | 15 February 1985 | Forwards Completed Forms on Emergency Notification Sys & Health Physics Network Telephone Sys.Info Reflects Both Existing & Proposed Locations |
ML091330140 | 31 December 1984 | NUREG-0857, Supplement No. 7, Safety Evaluation Report Related to the Operation of Palo Verde Nuclear Generation Station, Units 1, 2 and 3 |
ML17298B548 | 29 November 1984 | Ack Recent Region V Decision to Install Health Physics Network (HPN) Instead of Fts,As Discussed in Plant Emergency Plan.Util Awaiting Guidance on HPN Requirements & Schedule for Installation.Emergency Plan Will Be Revised |
ML20072K652 | 26 January 1983 | Public Version of Rev 1 to Emergency Plan Implementing Procedure EPIP-14B, Dose Assessment & Rev 0 to Procedures EPIP-01 Through EPIP-14A & EPIP-15 Through EPIP-55.Revised Index Encl |
ML17297B448 | 8 April 1982 | Advises That No Action Will Be Taken to Provide Emergency Notification Sys & Health Physics Network Access Capability in NRC Resident Inspector Ofc & Shift Supervisor Ofc.No Specific Requirements Located for Above Ofcs |
ML17297B153 | 5 January 1982 | Confirms Requirements of Emergency Notification Sys & Health Physics Network Re Fuel Shipment on 820401 & Fuel Loading in Nov 1982.Coordination of Efforts Requested in Order to Meet Scheduled Dates |