Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000483/202301115 June 2023Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011
IR 05000483/202200412 January 2023Integrated Inspection Report 05000483/2022004
ML23062A64429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23062A64529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML22307A3123 November 2022Evaluation of the Proposed Change
IR 05000483/202200227 July 2022Integrated Inspection Report 05000483/2022002
ML22181B13930 June 2022Attachment 9 - Responses to NRC Audit Questions
IR 05000483/202200126 April 2022Integrated Inspection Report 05000483/2022001
IR 05000483/20210038 November 2021Integrated Inspection Report 05000483/2021003
ML21193A19022 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.110 July 2020Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1
IR 05000483/201901122 November 2019Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2019011
ML20209A04213 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML19024A47223 January 2019Attachment 2 - Changes to Information and Documents Provided in March 9, 2018 License Amendment Request (LAR)
ML19024A47123 January 2019Attachment 1 - NRC Audit Questions and Responses
ML19009A3449 January 2019NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Plant Class 1E LAR, L-2018-LLA-0062
IR 05000483/201800319 October 2018NRC Integrated Inspection Report 05000483/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201045/2018001
IR 05000483/201600212 August 2016NRC Integrated Inspection Report 05000483/2016002 and Notice of Violation
ULNRC-06310, Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049)6 July 2016Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049)
ULNRC-06240, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)27 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
IR 05000483/20150023 August 2015IR 05000483/2015002; on 03/22/2015 - 06/20/2015; Callaway Plant, Integrated Resident and Regional Report; Maintenance Risk Assessments and Emergent Work Control and Operability Determinations and Functionality Assessments
IR 05000483/201400731 July 2014IR 05000483-14-007; on April 14 Through July 2, 2014; Callaway Plant Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Bases Inspection.
ULNRC-06070, RAI Respose to Application for Amendment, (LDCN 12-0015), Revision to Technical Specification 3.7.916 January 2014RAI Respose to Application for Amendment, (LDCN 12-0015), Revision to Technical Specification 3.7.9
ML13331A57125 November 2011Enclosure to ULNRC-06038 - 10 CFR 50.59 Summary Report for November 25, 2011 to May 28, 2013
ULNRC-05734, Transmittal of 10 CFR 50.59 Summary Report26 October 2010Transmittal of 10 CFR 50.59 Summary Report
IR 05000483/201000219 April 2010IR 05000483-10-002 on 01/01/10 - 03/24/10 for Callaway Plant
ULNRC-05117, Technical Specification Revisions Associated with the Steam Generator Replacement Project11 February 2005Technical Specification Revisions Associated with the Steam Generator Replacement Project
ML04343016820 December 2004RAI, Containment Integrity for the Steam Generator Replacement in the Fall of 2005 (TAC MC4437),12/20/04 Ltr to G. Randolph
ML04286035217 September 2004Amerenue - Callaway Plant OL Amendment #1248 Replacement Steam Generators, Non-Proprietary
ML04287037217 September 2004Amerenue - Callaway Plant OL Amendment #1248 Replacement Steam Generators, Non-Proprietary, NSSS Systems