Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20309A728 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
ML20309A744 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities |
IR 05000369/2020012 | 31 July 2020 | NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000369/2020012 and 05000370/2020012 |
ML19128A326 | 20 June 2019 | Alternative to Depth Sizing Qualification Examination of Welds |
ML20095H529 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 18 |
ML20093D926 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 |
RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 | 12 November 2018 | Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 |
ML18074A016 | 15 March 2018 | Emailed Hs 2018002 Hs |
ML17356A178 | 13 December 2017 | Attachment 1: WCAP-18265-NP, Rev. 0, Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 & 2 Reactor Vessel Internals. |
ML20311A519 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000369/2016002 | 22 July 2016 | NRC Integrated Inspection Report 05000369/2016002 and 05000379/2016002 |
MNS-15-014, LTR-PAFM-14-114-NP, Rev. 0, Technical Justification to Support Extended Volumetric Examination Interval for McGuire, Unit 1, Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds (Non-Proprietary) | 28 February 2015 | LTR-PAFM-14-114-NP, Rev. 0, Technical Justification to Support Extended Volumetric Examination Interval for McGuire, Unit 1, Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds (Non-Proprietary) |
IR 05000369/2014005 | 3 February 2015 | IR 05000369/2014005, IR 05000370/2014005; 10/01/2014 - 12/31/2014; McGuire Nuclear Station, Units 1 and 2; Fire Protection and Refueling and Other Outage Activities |
IR 05000369/2012005 | 25 January 2013 | IR 05000369-12-005, 05000370-12-005, 05000369-12-502, 05000370-12-502; 10/01/2012 - 12/31/2012; McGuire Nuclear Station, Units 1 and 2; Fire Protection |
ML12173A061 | 4 June 2012 | Relief Request Serial # 11-MN-001, Response to Request for Additional Information on Limited Weld Examinations for Refueling Outages 1 EOC20 and 2EOC19 |
IR 05000369/2012002 | 26 April 2012 | IR 05000369-12-002 and 05000370-12-002; Duke Energy Carolinas, LLC; 01/01/2012 - 03/31/2012; McGuire Nuclear Station, Units 1 and 2, NRC Integrated Inspection Report |
ML113010501 | 28 October 2011 | Integrated Inspection Report and Exercise of Enforcement Discretion 2011004 |
ML11160A144 | 23 June 2011 | Relief 10-MN-002, Extension of Volumetric Inspection of Steam Generator Primary Manway Studs for One Operating Cycle Beyond the Third 10-Year Inservice Inspection Interval End Date |
IR 05000369/2011002 | 6 May 2011 | IR 05000369-11-002, 05000370-11-002, on 1/1/2011 - 3/31/2011, McGuire Nuclear Station, Licensed Operator Requalification Program, Follow-up of Events and Notices of Enforcement Discretion |
ML102510185 | 30 August 2010 | Relief Request Serial # 10-MN-002 Volumetric Inspection of Steam Generator Primary Manway Studs |
IR 05000369/2010003 | 26 July 2010 | IR 05000369-10-003 and 05000370-10-003, on 04/01/10 - 06/30/10; McGuire Nuclear Station Maintenance Risk Assessment, Radiological Hazard Assessment and Exposure Controls |
IR 05000369/2010002 | 28 April 2010 | IR 05000369-10-002, IR 05000370-10-002; 1/1/2010 - 03/31/2010: McGuire Nuclear Station, Fire Protection, Plant Modifications, Event Follow-Up |
IR 05000369/2009004 | 29 October 2009 | IR 05000369-09-004 05000370-09-004; on 7/1/2009 - 9/30/2009; McGuire Nuclear Station, Surveillance Testing, and Radiation Monitoring Instrumentation and Protective Equipment |
IR 05000369/2009003 | 30 July 2009 | IR 05000369-09-003, 05000370-09-003 on 04/01/2009 - 06/30/2009 for McGuire, Units 1 & 2, Integrated Inspection |
ML080990550 | 5 April 2008 | G20080204 - William E. Smith Ltr. Request That McGuire Nuclear Station Not Start Up Due to a Potential Melt Down (Ref 10 CFR 2.206) |
IR 05000369/2007003 | 24 July 2007 | IR 05000369-07-003, 05000370-07-003, on 04/01/2007 - 06/30/2007; McGuire Nuclear Station, Units 1 and 2; Routine Integrated Report |
IR 05000369/2005003 | 22 July 2005 | IR 05000369-05-03 and IR 05000370-05-03, on 04/01/2005 - 06/30/2005, McGuire Nuclear Station, Units 1 and 2; Fire Protection and Other Activities |
IR 05000369/2005002 | 28 April 2005 | IR 05000369-05-002, IR 05000370-05-002, and IR 07200038-05-001, on 01/01/2005 - 03/31/2005 for McGuire, Units 1 and 2; Operability Evaluations, Surveillance Testing, Access Controls to Radiologically Significant Areas, Radiation Monitoring. |
ML050190290 | 12 January 2005 | NRC Response for Additional Information End of Cycle 16 Steam Generator Inservice Inspection Summary Report |
ML043280410 | 15 November 2004 | October 2004 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, & Catawba Nuclear Station |
IR 05000369/2004004 | 9 July 2004 | IR 05000369-04-004 & 05000370-04-004, on 03/14/04 Through 06/12/04, for McGuire Nuclear Station Units 1 & 3; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Access Control to Radiologically Significant Area & ALARA Plannin |
ML041410304 | 13 May 2004 | April 2004 Monthly Operating Report for Oconee, McGuire and Catawba Nuclear Power Plants |
ML040230335 | 15 January 2004 | December 2003 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations |
ML032890405 | 1 October 2003 | Response to Request for Additional Information Regarding the Use of Mixed Oxide Fuel Lead Assemblies |
ML030730632 | 3 March 2003 | Duke Power Co 20-Day Response to NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors |
ML022270652 | 14 August 2002 | Chapter 3 Draft SER with Open Items, Aging Management Review Results |
ML20199G915 | 19 November 1997 | Responds to NRC Re Violations Noted in Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920.Corrective Actions:Unit 2 Was Shutdown & Leaking 2A SG Tube R7C60 Was Identified by Secondary Side Pressure Testing |
ML20198N470 | 20 October 1997 | Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 |
IR 05000369/1997015 | 20 October 1997 | Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
ML20149L575 | 28 July 1997 | Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support |
ML20101C828 | 8 March 1996 | Proposed Tech Specs Reflecting Separate Vols for Unit 1 & Unit 2 |
ML20073J915 | 19 September 1994 | Replacement Steam Generator Topical Rept |
ML20078C547 | 1 April 1994 | Summary of Nuclear Station Mods Completed Under 10CFR50.59 for Period 930401-940401 |
ML20059L065 | 26 January 1994 | Summary of 931201 Meeting W/Util in Rockville,Md Re Presentation by Licensee on SG Replacement Project. Attendees Listed in Encl 1 |
ML20059F252 | 25 October 1993 | Summary of Nuclear Station Mods,Minor Mods & Procedure Changes Made to Plant for Period of 920401-930401 |
IR 05000369/1993012 | 2 September 1993 | Insp Repts 50-369/93-12 & 50-370/93-12 on 930719-23 & 0802- 06.No Violations or Deviations Noted.Major Areas Inspected: Unit 2 10-yr ISI of Rpv,Eddy Current Exam of SGs & Ultrasonic Exam of FW Nozzles & Related Piping Welds |
ML20101B863 | 1 June 1992 | Provides Revised Response to Violations Noted in Insp Repts 50-369/92-05 & 50-370/92-05.Corrective Actions:Current Analysis Mgt Personnel Conducted Review of Current Procedures & Made Enhancements as Necessary |
ML20116C186 | 31 March 1992 | Summary of McGuire Nuclear Station Modifications,Exempt Changes & Procedure Changes for Period of 910301-920331 |
ML20094H377 | 28 February 1992 | Provides Util Summary & Work Status in 920213 Telcon with NRC Staff on Unit 1 Restart After Steam Generator Tube Leak Outage & Eddy Current Test Results on Unit 2.Proposed Agenda for 920507 Meeting & Updated Unit 1 Action Plan Encl |
ML20090G169 | 26 February 1992 | Rev 0 to ISI Rept - Unit 1,McGuire 1991 Refueling Outage 7 |