Duke Power Co 20-Day Response to NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML030730632
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 03/03/2003
From: Mccollum W
Duke Power Co
To:
NRC/SECY/RAS
References
EA-03-009
Download: ML030730632 (5)


Text

Duke Power Company Duke Pk~ukeA Duke Energy Company WPower.

Energy Center A Duke Energy Cmpany P.O. Box 1006 Charlotte, NC 28201-1006 March 3, 2003 U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission ATTN: Rulemaking and Adjudications Staff Washington D.C.

20555

Subject:

Duke Energy Corporation Catawba Nuclear Station Units 1 & 2 Docket Nos. 50-413, 414 McGuire Nuclear Station Units 1 & 2 Docket Nos. 50-369, 370 Oconee Nuclear Station Units 1, 2 & 3 Docket Nos. 50-269, 270, 287 20 Day Response to NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors Pursuant to 10 CFR 2.202, this letter provides the Duke Energy Corporation (Duke) 20 Day Response to NRC Order Establishing Interim Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors for the Catawba, McGuire and Oconee Nuclear Stations dated February 11, 2003.

Duke consents to the requirements contained in the Order for Catawba, McGuire and Oconee Nuclear Stations.

Oconee Nuclear Station has plans to replace the reactor pressure vessel head (RPVH) on each unit at the end of each of the current respective operating cycles. After RPVH replacement, each Oconee Nuclear Station RPVH will be categorized as having low susceptibility based on the calculation defined in paragraph IV A

of the Order.

The Duke prescribed preservice inspection (beyond American Society of Mechanical EngineersSection III requirements) of each replacement RPVH nozzle includes Ultrasonic testing from the inner diameter

surface, Eddy current testing of portions of the tube inside and outside diameter
surfaces, and dye penetrant testing of the J-Groove weld surface and stub tube outside diameter surface.

These preservice examinations on the Oconee replacement RPVHs satisfy the requirements of a bare metal examination of 100% of the RPVH surface performed during the refueling outage immediately preceding the issuance of the Order as referred to in paragraph IV.C(3) of the Order.

U.S. NRC March 3, 2003 Page 2 If you have questions or need additional information, please contact Gregory S. Kent at (704)373-6032.

Very truly yours, W. R. Mc Collum Senior Vice President Nuclear Operations

U.S.

NRC March 3, 2003 Page 3 xc:

S.J. Collins U.S. Nuclear Regulatory Commission

Director, Office of Nuclear Reactor Regulation Washington D.C.

20555 L.A. Reyes U.S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, GA 30303 R.E. Martin NRC Project Manager (CNS and MNS)

U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 L.N. Olshan NRC Project Manager (ONS)

U.S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S.M. Shaeffer Senior Resident Inspector (MNS)

E.F. Guthrie Senior Resident Inspector (CNS)

M.C. Shannon Senior Resident Inspector (ONS)

U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C.

20555 U.S. Nuclear Regulatory Commission Assistant General Counsel for Materials Litigation and Enforcement Washington D.C.

20555

U.S. NRC March 3, 2003 Page 4 W. R.

Mc Collum, affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.

W. R. Mc Collun, Seniop6fce President Subscribed and sworn to me:

Notary Public My Commission Expires:

22W d,,-.5/1 2-00-3 Date Date SEAL

U.S. NRC March 3, 2003 Page 5 bcc: L.F. Vaughn -

PB05E M.T. Cash -

EC050 C.J. Thomas MG01RC G.D. Gilbert -

CN01RC L.E. Nicholson -

ON03RC M.R. Robinson -

EC09o G.S. Kent -

EC050 J.M. Shuping -

EC090 D.E. Whitaker -

EC090 K.L. Crane -

MGO1RC K.E. Nicholson -

CNO1RC J.E. Smith -

ON03RC Catawba Master File -

CN01DM McGuire Master File -

MG01DM Oconee Master File -

ON03DM Saluda River Electric Corporation NC Municipal Power Agency No.

1 TR Puryear, NC Electric Membership Corporation -

CN03G Piedmont Municipal Power Agency ELL -

EC050